The project of the sausage shop with a capacity of 24 tons of boiled, semi-smoked sausages, bacons and 0.8 tons of raw smoked sausages per shift
- Added: 24.01.2023
- Size: 258 KB
- Downloads: 4
Subscribe to receive an information about new materials:
Description
The project of the sausage shop with a capacity of 24 tons of boiled, semi-smoked sausages, bacons and 0.8 tons of raw smoked sausages per shift
Project's Content
|
|
|
|
|
|
|
|
|
|
The material is an archive with files that can be opened in programs:
- Kompas or KOMPAS-3D Viewer
- Microsoft Word
Additional information
Drawings content
пупсик 24,8 колбаски.cdw
Колбаса Пшено.docx
технолог схема Н готово.cdw
Similar materials
- 18.05.2020
- 13.04.2022
- 24.01.2023
- 24.01.2023
- 24.01.2023
- 21.05.2023
Free downloading for today
Update after: 2 hours 6 minutes