• RU
  • icon Waiting For Moderation: 0
Menu

Reconstruction of the TR zone of cars in the conditions of Stroytrans-NK LLC

  • Added: 15.05.2015
  • Size: 443 KB
  • Downloads: 1
Find out how to download this material

Description

This diploma project was developed on the topic "Reconstruction of the TR zone of cars in the conditions of Stroytrans-NK LLC ." The section "Technological layout" describes Stroytrans-NK LLC as a whole, as well as the TR zone. Shortcomings in the work of the site were identified, measures to improve work were outlined. The production program has been calculated and the TP area scope has been determined. The set of measures on safety and environmental protection is presented. Heating, lighting and ventilation of the site have been calculated. Operating costs, investments for the reconstruction of the site are calculated, the economic effect and payback period are determined. In the section "Job Instruction" the technological process was developed to replace the bearings of the front wheel of the KamAZ-55111 car, a plan of technological operations was drawn up. The time standards have been calculated and the process cost has been determined. The section "Design" describes the purpose of the device and the action of the extractor to remove the hub of the front wheel of the KamAZ car, the cost of manufacturing the device was calculated . This diploma project can be used as a recommended material for the reconstruction of the TR zone in Stroytrans-NK LLC or other motor transport enterprises.

Project's Content

icon
icon Chertezhpp_posle_rekonstruktsii.cdw
icon ekonomicheskaya_chat.bak
icon ekonomicheskaya_chat.cdw
icon novoe_prodolzhenie_soderzhania.doc
icon prisposoblenie_dlya_reguliroki_klapanov.bak
icon soderzhanie1.docx
icon syomnik_stupitsy.bak
icon syomnik_stupitsy.cdw
icon tekhnologicheskaya_karta.bak
icon tekhnologicheskaya_karta.cdw
icon ved_dok_org_am.doc
icon
icon Chertezhpp.bak
icon Chertezhpp.cdw
icon Chertezhpp_posle_rekonstruktsii.bak

Additional information

Contents

Introduction

1 Process layout

Brief description of the existing situation for the enterprise in

in general (date of formation, subordination, location, work performed, main types of transportation and services performed)

1.1.1 List of fleet by models

1.1.2 Vehicle operating conditions

1.1.3 Rolling stock operation mode

1.1.4 Operation Service Key Performance Indicators

1.1.5 Technical Service Key Performance Indicators

1.1.6 Methods of vehicle maintenance and maintenance

1.1.7 Power, steam, water supply options

1.2 Description of the existing situation of the reconstructed production division

1.2.1 Purpose and nomenclature of subdivision works

1.2.2 List and brief technical description of existing

equipment, accessories and tools, process layout of the site, organization of work on the site

1.2.3 Prospects of the reconstructed area development, possibility of its expansion

1.2.4 States, composition of production and auxiliary workers, safety condition

1.2.5 Proposals for improvement of the technological process and organization of the division's work

1.3 Initial Data and Demand Calculation

1.4 Calculation of number of workplaces

1.5 Calculation and selection of necessary equipment

1.6 Area calculation

1.7 Proposed Production Unit Organization

1.8 Designed environmental protection measures

1.9 Designed safety measures and

fire-fighting equipment, industrial sanitation, and technical

to esthetics

1.10 Economic part

1.10.1 Calculation of the number of production workers

1.10.2 Calculation of cost estimates

1.10.3 Costing

1.10.4 Cost effectiveness of project proposals on

reconstruction of production unit

2 Job Instruction

2.1 Sequence of operation with indication of equipment and

workplace

2.2 Calculation of the time norm for the process

2.3 Process

2.4 Determination of the number of dismantling, assembly units

2.5 Determination of the method of selection of parts during picking

2.6 Process Instructions

2.7 Process Flow Diagram

2.8 Composition determination and sequence of operations. Definition

time standards

2.9 Calculation of process cost

3 Construction

3.1 Rationale for design development and implementation

3.2 Purpose, device and operation of the structure

3.3 Calculation of the working force of the structure required for the drive

3.4 Calculation for strength of basic, decisive parts of the structure

3.5 Adjustment, Adjustment and Safety Instructions

designed structure

3.6 Manufacturing process of one accessory part

3.7 Economic efficiency of the design

3.8 Advantages of implementation of designed design

Conclusion

Literature

Drawings content

icon Chertezhpp_posle_rekonstruktsii.cdw

Chertezhpp_posle_rekonstruktsii.cdw

icon ekonomicheskaya_chat.cdw

ekonomicheskaya_chat.cdw

icon syomnik_stupitsy.cdw

syomnik_stupitsy.cdw

icon tekhnologicheskaya_karta.cdw

tekhnologicheskaya_karta.cdw

icon Chertezhpp.cdw

Chertezhpp.cdw
up Up