Reconstruction of the TR zone of cars in the conditions of Stroytrans-NK LLC
- Added: 15.05.2015
- Size: 443 KB
- Downloads: 1
Description
Project's Content
|
Chertezhpp_posle_rekonstruktsii.cdw
|
ekonomicheskaya_chat.bak
|
ekonomicheskaya_chat.cdw
|
novoe_prodolzhenie_soderzhania.doc
|
prisposoblenie_dlya_reguliroki_klapanov.bak
|
soderzhanie1.docx
|
syomnik_stupitsy.bak
|
syomnik_stupitsy.cdw
|
tekhnologicheskaya_karta.bak
|
tekhnologicheskaya_karta.cdw
|
ved_dok_org_am.doc
|
|
Chertezhpp.bak
|
Chertezhpp.cdw
|
Chertezhpp_posle_rekonstruktsii.bak
|
Additional information
Contents
Introduction
1 Process layout
Brief description of the existing situation for the enterprise in
in general (date of formation, subordination, location, work performed, main types of transportation and services performed)
1.1.1 List of fleet by models
1.1.2 Vehicle operating conditions
1.1.3 Rolling stock operation mode
1.1.4 Operation Service Key Performance Indicators
1.1.5 Technical Service Key Performance Indicators
1.1.6 Methods of vehicle maintenance and maintenance
1.1.7 Power, steam, water supply options
1.2 Description of the existing situation of the reconstructed production division
1.2.1 Purpose and nomenclature of subdivision works
1.2.2 List and brief technical description of existing
equipment, accessories and tools, process layout of the site, organization of work on the site
1.2.3 Prospects of the reconstructed area development, possibility of its expansion
1.2.4 States, composition of production and auxiliary workers, safety condition
1.2.5 Proposals for improvement of the technological process and organization of the division's work
1.3 Initial Data and Demand Calculation
1.4 Calculation of number of workplaces
1.5 Calculation and selection of necessary equipment
1.6 Area calculation
1.7 Proposed Production Unit Organization
1.8 Designed environmental protection measures
1.9 Designed safety measures and
fire-fighting equipment, industrial sanitation, and technical
to esthetics
1.10 Economic part
1.10.1 Calculation of the number of production workers
1.10.2 Calculation of cost estimates
1.10.3 Costing
1.10.4 Cost effectiveness of project proposals on
reconstruction of production unit
2 Job Instruction
2.1 Sequence of operation with indication of equipment and
workplace
2.2 Calculation of the time norm for the process
2.3 Process
2.4 Determination of the number of dismantling, assembly units
2.5 Determination of the method of selection of parts during picking
2.6 Process Instructions
2.7 Process Flow Diagram
2.8 Composition determination and sequence of operations. Definition
time standards
2.9 Calculation of process cost
3 Construction
3.1 Rationale for design development and implementation
3.2 Purpose, device and operation of the structure
3.3 Calculation of the working force of the structure required for the drive
3.4 Calculation for strength of basic, decisive parts of the structure
3.5 Adjustment, Adjustment and Safety Instructions
designed structure
3.6 Manufacturing process of one accessory part
3.7 Economic efficiency of the design
3.8 Advantages of implementation of designed design
Conclusion
Literature
Chertezhpp_posle_rekonstruktsii.cdw
ekonomicheskaya_chat.cdw
syomnik_stupitsy.cdw
tekhnologicheskaya_karta.cdw
Chertezhpp.cdw
Similar materials
- 04.11.2022
- 04.06.2014
- 11.09.2022
- 29.07.2014
- 08.06.2018