• RU
  • icon Waiting For Moderation: 0
Menu

Wellness Complex, Perm - Architecture, Technology Map

  • Added: 09.07.2014
  • Size: 1 MB
  • Downloads: 0
Find out how to download this material

Description

Degree project - ASG. Architecture, designs, organization, technology. Drawings + DBE

Project's Content

icon
icon ТиОС.dwg
icon ПЗ арх.doc
icon ПЗ конструкции.doc
icon ПЗ ТиОС.doc

Additional information

Contents

Contents

p

1. Total Part 5-

1.1. Design Input

1.2. Volumetric planning solution

2. Design solutions7-

2.1. Structural type of building, support conditions

stiffness and stability

2.2. Description of individual design solutions

buildings (sketches)....... 7-

2.3. Floor Explication .13 -

2.4. List of jumpers

3. The Спецификации16th

3.1. Opening Infill Feature Specification

3.2. Specification of precast concrete and reinforced concrete elements.17-

4. Finishing

4.1. Description of exterior decoration of the building

4.2. Interior Decoration List

5. Brief information on engineering equipment of the building

6. Technical - economic indicators for the building

7. Appendix... 22-

8. List of literature used

1. Common part.

1.1. Design Input.

The diploma project was developed on the basis of a design assignment.

The construction area is the city of Perm. Perm City: belongs to the 1st climatic district; to the subdistrict _v (see Construction Norms and Regulations 23.01 - 99 "Construction climatology", schematic card 1 of p. 51.).

Design temperatures for the city of Perm are:

• Coldest five-day period -35 ° C.

• Coldest days -39 ° C.

• Absolute minimum -47 ° C.

(see SNiP 23.01 - 99 page 4, security is accepted as per column "0.92").

According to SNiP 2.01.07-85 * "Loads and Impacts," the calculated snow load is accepted for the V region and amounts to 3.2 KPA (Table 4 * p. 9).

The wind load is accepted in area II and is 0.30 Kpa.

The prevailing wind direction for the coldest period December-February:

• southerly winds

for the hottest period of the year June-August:

• northerly winds

The parameters are accepted according to many years of research in the city of Perm.

1.2. Volumetric - planning solution.

The space-planning solution is made on the basis of the design task, taking into account the purpose of the building.

The building has a rectangular plan shape. Dimensions in axes 19.53 * 16.2 m.

The building is 4 storeys; with a floor height of 3.3 m; with room height 3.0 m; the building has a "cold" attic, a basement with a floor height of 2.8 m; with a room height of 2.5 m.

According to the planning structure - a corridor-type building.

The wellness complex includes: 3 gyms, men's and women's locker rooms with showers and bathrooms, a massage room, a sauna, a solarium, a billiard room, hotel rooms with 20 seats, an administrator's office, a security room, a room for maintenance staff, a staff wardrobe.

The explication of rooms 1 and 2 floors is given on 1 sheet of the project.

The building class is IV.

Degree of fire resistance - III.

The degree of durability is II.

Degree of reliability - II (SNiP 2.01.0785 *)

2. Design solutions.

2.1. Structural building type, conditions

providing rigidity, stability.

The building belongs to the structural type with an internal frame.

Diagram with longitudinal arrangement of girders.

Slabs rest on two sides on walls and girders.

The rigidity and stability of the building is ensured by:

• correct structural solution of the foundation

• reliable interfacing of walls with foundation

• anchoring slabs with walls through one slab on external walls and anchoring slabs to each other on internal walls - seams between slabs are sealed with concrete on fine gravel, which creates a hard slab disk.

Additional stiffness conditions are created by the walls of the stairwell.

4.1. Description of the exterior decoration of the building.

External walls: lined with ceramic brick grade 100, on cement sand mortar grade 75.

The base of the building is made of red ceramic brick of grade 150 on cement sand mortar of grade 100, plastered and painted brown with paint from the Paints-Hemi factory.

The roof is covered with a Monterrey metal block from the Metal Profile company in brown color.

5. Engineering Brief

building equipment.

Water supply - economically potable, calculated head at the base of risers - 1.8 * 105 Pa.

Sewerage - household - with diversion to the city network.

Water heating. The system is single-tube with a lower dilution, dead end.

Radiators M - 140 - AO.

Coolant temperature 70-95 ° C.

The ventilation is natural.

Hot water supply from the external network. The design head at the base of the risers is 1.9 * 105 Pa.

Gas supply from the external network to the cookers.

Power supply - category III, voltage 220/380 V, lighting by filament lamps.

Communication device - radio, collective television antenna, telephone output.

Bathroom equipment - toilets, baths, washbasins.

Drawings content

icon ТиОС.dwg

ТиОС.dwg

Free downloading for today

Update after: 8 hours 27 minutes
up Up