• RU
  • icon Waiting For Moderation: 1
Menu

Capstone C1000, C800 and 2.9MW boiler house gas supply project

Description

I am presenting a project for gas supply from one GRP factory production of two Capstone C1000, C800 microturbines and a boiler house for 2.9MW.

The project was carried out in accordance with the requirements of SNiP II-35-76 Boiler plants with Changes N1.2, SNiP 42-01-2002 Gas Distribution Systems and PB 12-529-03 "Safety Rules for Gas Supply and Gas Consumption Systems," based on the Customer's technical assignment for the reconstruction of the facility power unit
Technical re-equipment of the power unit is provided in one stage.

Project's Content

icon
icon proekt_gazosnabzhenija_mikroturbin.dwg
The material is an archive with files that can be opened in programs:
  • AutoCAD or DWG TrueView

Additional information

Drawings content

icon proekt_gazosnabzhenija_mikroturbin.dwg

proekt_gazosnabzhenija_mikroturbin.dwg
up Up