Capstone C1000, C800 and 2.9MW boiler house gas supply project
- Added: 09.08.2014
- Size: 875 KB
- Downloads: 0
Description
I am presenting a project for gas supply from one GRP factory production of two Capstone C1000, C800 microturbines and a boiler house for 2.9MW.
The project was carried out in accordance with the requirements of SNiP II-35-76 Boiler plants with Changes N1.2, SNiP 42-01-2002 Gas Distribution Systems and PB 12-529-03 "Safety Rules for Gas Supply and Gas Consumption Systems," based on the Customer's technical assignment for the reconstruction of the facility power unit
Technical re-equipment of the power unit is provided in one stage.
Project's Content
|
proekt_gazosnabzhenija_mikroturbin.dwg
|
Additional information
proekt_gazosnabzhenija_mikroturbin.dwg
Similar materials
- 01.07.2014
- 09.08.2014
Free downloading for today
- 21.04.2016