The project of gas supply of the boiler house of the café - Internal gas supply.
- Added: 14.06.2023
- Size: 2 MB
- Downloads: 1
Find out how to download this material
Subscribe to receive an information about new materials:
Description
The project of gas supply to the boiler house of the café. Internal gas supply.
The boiler house is equipped with two hot water boilers: "De Dietrich DTG 220-9 Eco.NOx/II" with a capacity of 36-72.0 kW and "VVaillant atmoTEC pro VUW INT 240/3-3" with a capacity of 9.6-24.0 kW.
LIST OF WORKING DRAWINGS OF THE MAIN SET OF GSV:
- General data sheet (beginning);
- General data sheet (end);
- Plan of the existing boiler house on otm. 0.000 (M 1:50);
- Situational plan. Scheme of gas pipelines of the existing boiler house;
- Workshop plan for otm. 0.000 (M 1:50). Scheme of gas pipelines of the workshop
- Specification of equipment, products and materials;
- Application. UIRG approval sheet.
Project's Content
Проект ГСВ Кафе.dwg
|
Similar materials
- 01.07.2014
- 09.08.2014
Free downloading for today
Update after: 7 hours 58 minutes
- 06.06.2020