• RU
  • icon Waiting For Moderation: 9
Menu

The project of gas supply of the boiler house of the café - Internal gas supply.

  • Added: 14.06.2023
  • Size: 2 MB
  • Downloads: 1
Find out how to download this material

Description

The project of gas supply to the boiler house of the café. Internal gas supply.

The boiler house is equipped with two hot water boilers: "De Dietrich DTG 220-9 Eco.NOx/II" with a capacity of 36-72.0 kW and "VVaillant atmoTEC pro VUW INT 240/3-3" with a capacity of 9.6-24.0 kW.

 

LIST OF WORKING DRAWINGS OF THE MAIN SET OF  GSV:

  • General data sheet (beginning);
  • General data sheet (end);
  • Plan of the existing boiler house on otm. 0.000 (M 1:50);
  • Situational plan. Scheme of gas pipelines of the existing boiler house;
  • Workshop plan for otm. 0.000 (M 1:50). Scheme of gas pipelines of the workshop
  • Specification of equipment, products and materials;
  • Application. UIRG approval sheet.

Project's Content

icon Проект ГСВ Кафе.dwg
up Up