• RU
  • icon Waiting For Moderation: 12
Menu

Dust preparation system of boiler E-320-13.8-560KT

  • Added: 21.05.2014
  • Size: 995 KB
  • Downloads: 0
Find out how to download this material

Description

Boiler dust treatment systems 320 t/h. It is equipped with 2 ShBM mills and industrial bunkers . Used to prepare fuel for flaring. R90 = 12. One drawing.

Project's Content

icon sistema-pyleprigotovleniya--kotla-e-320-138-560kt-8-gorelok.cdw

Additional information

Drawings content

icon sistema-pyleprigotovleniya--kotla-e-320-138-560kt-8-gorelok.cdw

sistema-pyleprigotovleniya--kotla-e-320-138-560kt-8-gorelok.cdw
up Up