Technologchek maps for road construction
- Added: 16.07.2020
- Size: 2 MB
- Downloads: 2
Subscribe to receive an information about new materials:
Description
Technologchek maps for the construction of highway 1. for removal of vegetable layer and preparation of fill base 2. to the device of excavation by the excavator with bucket 1.0 - 1.6 m cub, and transportation by automatic dump trucks 3. for erection of embankment with soil development by excavators and movement by automatic dump trucks (4). on the device of crushed stone-underlying layer from SFCS S-4 5. for asphalt concrete pavement of road 6.for construction of road structural elements
Project's Content
|
|
The material is a file that can be opened in program:
- AutoCAD or DWG TrueView
Similar materials
- 04.02.2023
Free downloading for today
Update after: 6 hours 59 minutes