• RU
  • icon Waiting For Moderation: 1
Menu

Installation of booster pumps. Section TH

Description

The design envisages installation of two K200-150-315 booster pumps in the pump station room - The designed pipelines belong to group B, category V according to PB-03-585-03-



After tightness and strength tests of pipelines and equipment surfaces, apply protective and identification painting according to GOST 14202-69.

Project's Content

icon
icon
icon ТХ 1.dwg
The material is an archive with files that can be opened in programs:
  • AutoCAD or DWG TrueView
up Up