Installation of booster pumps. Section TH
- Added: 14.08.2014
- Size: 1023 KB
- Downloads: 1
Find out how to download this material
Subscribe to receive an information about new materials:
Description
The design envisages installation of two K200-150-315 booster pumps in the pump station room - The designed pipelines belong to group B, category V according to PB-03-585-03-
After tightness and strength tests of pipelines and equipment surfaces, apply protective and identification painting according to GOST 14202-69.
After tightness and strength tests of pipelines and equipment surfaces, apply protective and identification painting according to GOST 14202-69.
Project's Content
|
|
ТХ 1.dwg
|
Similar materials
- 20.09.2021
- 20.09.2021
- 20.09.2021
- 04.06.2021
- 20.12.2023
- 03.05.2023
Free downloading for today
Update after: 21 hours 48 minutes