• RU
  • icon Waiting For Moderation: 1
Menu

Replacement of the cold water supply system in the MCD with the installation of a booster pump

Description

Overhaul of the cold water supply system in a 9-storey residential building with the installation of a booster pump

Project's Content

icon НС_Q0210230114-1 КП.pdf
icon 25 января, 6 ХВС от02.10.2023.dwg
The material is an archive with files that can be opened in programs:
  • Adobe Acrobat Reader
  • AutoCAD or DWG TrueView
up Up