• RU
  • icon Waiting For Moderation: 0
Menu

Replacement of the cold water supply system in the MCD with the installation of a booster pump

  • Added: 20.12.2023
  • Size: 4 MB
  • Downloads: 0
Find out how to download this material

Description

Overhaul of the cold water supply system in a 9-storey residential building with the installation of a booster pump

Project's Content

icon НС_Q0210230114-1 КП.pdf
icon 25 января, 6 ХВС от02.10.2023.dwg
up Up