• RU
  • icon Waiting For Moderation: 21
Menu

Overhaul of the heating system with bottom wiring and installation of AUU in a basementless MCD

  • Added: 20.12.2023
  • Size: 1 MB
  • Downloads: 0
Find out how to download this material

Description

Overhaul of the heating system in an apartment building without a basement. The lower wiring is laid in the underfloor channels, the mixing unit is installed under the stairs in the entrance. The old system of steel pipes and cast iron radiators is being replaced with a new one made of polypropylene pipes and bimetal radiators

Project's Content

icon путилина 14а ОВ новый файл_ изм.dwg
up Up