• RU
  • icon Waiting For Moderation: 0
Menu

Overhaul of the MKD heating system with top wiring and installation of AUU

  • Added: 20.12.2023
  • Size: 3 MB
  • Downloads: 0
Find out how to download this material

Description

Working documentation for the overhaul of the heating system of an apartment building with top wiring and installation of an automatic mixing unit. Replacement of the existing system (metal pipes and cast iron radiators) with a new one (polypropylene pipes, bimetal radiators)

Project's Content

icon Пр-кт.Труда, 12 ОВ 05.09.2023 изм.2.dwg

Free downloading for today

Update after: 9 hours 47 minutes
up Up