Overhaul of the MKD heating system with top wiring and installation of AUU
- Added: 20.12.2023
- Size: 3 MB
- Downloads: 0
Find out how to download this material
Subscribe to receive an information about new materials:
Description
Working documentation for the overhaul of the heating system of an apartment building with top wiring and installation of an automatic mixing unit. Replacement of the existing system (metal pipes and cast iron radiators) with a new one (polypropylene pipes, bimetal radiators)
Project's Content
Пр-кт.Труда, 12 ОВ 05.09.2023 изм.2.dwg
|
Similar materials
- 20.12.2023
- 24.04.2014
- 24.04.2014
- 15.09.2024
- 24.04.2014
Free downloading for today
Update after: 9 hours 47 minutes