• RU
  • icon Waiting For Moderation: 21
Menu

Diploma "Hotel"

  • Added: 11.08.2012
  • Size: 10 MB
  • Downloads: 7
Find out how to download this material

Description

many drawings, DBE

Project's Content

icon
icon
icon
icon Архитектура.doc
icon
icon КРОВЛЯ, ПЛАН ТИПОВОГО ЭТАЖА.bak
icon КРОВЛЯ, ПЛАН ТИПОВОГО ЭТАЖА.dwg
icon ПЛАН_1,2.bak
icon ПЛАН_1,2.dwg
icon РАЗРЕЗЫ.bak
icon РАЗРЕЗЫ.dwg
icon
icon ФАСАД.bak
icon ФАСАД.dwg
icon
icon Экспликация 1 этажа.bak
icon Экспликация 1 этажа.dwg
icon Экспликация 2 этажа.dwg
icon Экспликация типового этажа.dwg
icon Экспликация типового этажа.dwl
icon Экспликация типового этажа1.bak
icon Введение.doc
icon ДОКЛАД.doc
icon
icon dr01.bak
icon dr01.dwg
icon dr02.bak
icon dr02.dwg
icon lm.lir
icon plot.log
icon pz01.doc
icon pz02.doc
icon r06p220.dwg
icon r07p220.dwg
icon Лестничный марш с площадкой.bak
icon Лестничный марш с площадкой.dwg
icon Перекрытие.dwg
icon
icon ОСНОВАНИЕ И ФУНДАМЕНТЫ.doc
icon основание ифундаменты.dwg
icon
icon Организ строит.doc
icon СГП,техкарта,кал.план.bak
icon СГП,техкарта,кал.план.dwg
icon Сметный раздел.doc
icon содержание.doc
icon Список литературы.doc
icon
icon Записка по сравнению.doc
icon сравнение1.bak
icon сравнение1.dwg
icon
icon Технико.doc

Additional information

Contents

1. Introduction

2.Variable design of feasibility study of decisions made

2.1 Comparative versions of waterproofing carpet

2.1.1Installation data 2.1.2 Evaluation of design design efficiency

2.1.3 Local Estimate Calculation No.

2.1.4 Local estimate calculation No. 2. 14 2.1.5 Local estimate calculation No. 3. 16 2.1.6 Calculation of roofing works duration

2.2 Technical and economic indicators

3. Architecturally building section

3.1 General provision

3.2 Volumetric planning solutions

3.3 Design Solutions

3.4 Architectural Solutions

3.5 Fire fighting measures

3.6 Heat Engineering Calculation

4. Design section

4.1 Calculation of multi-stop slab

4.1.1 Load collection

4.1.2 Plate calculation by I group of limit states

4.1.3 Determination of characteristics of the given section

4.1.5 Pre-stress loss of valves

4.2 Calculation of strength in the manufacturing stage

4.2.1 Calculation of strength by inclined sections

4.2.2 Calculation for formation of cracks normal to longitudinal axis

element

4.2.3 Calculation of stairway and platform 42 4.2.4 Load collection

4. 2.5 Calculation of crack opening normal to longitudinal axis

4.2.6 Calculation of short-term crack opening

5. Foundations and foundations

5.1 Initial data

5.2 Determination of loads acting on foundations

5.3 Determination of force from horizontal soil and water pressures

5.4 Definition of PIImt

5.5 Determination of foundation settlement

6. Construction Organization Technology

6.1 General Part

6.1.1 Initial data

6.2 Job Instruction

6.2.1 Scope of Work

6.2.2 Determination of labour intensity of works

6.2.3 Determination of Material and Technical Resources

6.2.4 Technical and economic indicators

6.3 Determination of Construction Duration

6.3.2 Calculation of excavation volumes

6.3.3 Earthworks Scope

6.3.4 Material Specification

6.3.5 Summary Bill of Quantities

6.3.6 Statement of labour costs and material and technical resources

6.3.7 Material consumption

6.4 Construction Schedule

6.4.1 Selection of machines, mechanisms and methods of work

6.4.2 Earthworks

6.4.3 Machines for concrete works

6.4.4 Selection of installation cranes

6.4.5 Description of works

6.4.6 Construction of the basement of the hotel

6.4.7 Construction of the above-ground part of the hotel

6.4.8 Hotel roof arrangement

6.4.9 Finishing works and special works of a residential building

6.4.10 Monolithic floor arrangement

6.5 Calculation of Construction Water Demand

6.6 Power supply for construction

6.7 Temporary heat supply

6.8 Storage Site Calculation

6.9 Calculation of requirements for temporary buildings and structures

6.10 Technical and economic indicators

7. Economic section

8. Technical and economic indicators

9. Safety of life

9.1 Occupational safety in construction

9.2 General Site Safety Requirements

9.3 Basic Safety Requirements for Construction

works

9.3.1 Earthworks

9.3.2 Loading and unloading operations

9.3.3 Concrete and reinforced concrete works

9.3.4 Stone works

9.3.5 Installation works

9.3.6 Roofing works

9.3.7 Finishing works

9.3.8 Electric welding works. 142 9.4 Fire prevention measures

9.5 Electrical safety 145 9.5.1 Calculation of protective grounding

9.5.2 Calculation of searchlight

9.6 Project Environmental Friendliness

List of literature

General position

The hotel is designed for living and providing, household and public needs of a person.

The hotel has single rooms and suites with showers from 1 to 5 floors. Each room is equipped with a balcony or loggia

All rooms have a common exit to the corridor, separated from the elevator hall. In the basement there is a laundry for the hotel for 70 kg s/lingerie with separate evacuation exit.

The design provides for the required duration of insolation and natural illumination in each room in accordance with the requirements of SNiP 2.08.0189 *.

The building structures and materials provided for the construction of the hotel are environmentally clean and are allowed for use by the State Insurance Service.

Reduction of external noise impact is provided by use of window blocks with slender glazing.

- Building responsibility level as per GOST 2775188 - II (normal).

- Fire resistance degree according to SNiP 210197 - I.

- Structural fire hazard class as per SNiP 210197 - С 1.

- Durability - II

Architectural and artistic solution

A section of the designed building with built-in rooms and open parking for the hotel is located in ordinary residential buildings.

A 5-storey hotel is offered on the designed area.

The hotel building has a simple rectangular plan shape.

The exterior design of the building is selected in the complex, color solutions are selected taking into account the best visual perception of the building as a whole, taking into account the architectural decisions of the surrounding buildings and the structure. Advanced materials with the best physical and operational indicators, as well as taking into account their cost indicators, are used in the finishing of the building.

The facade is painted with horizontal stripes. Three layers of lime-chalk paint are applied over the leveling layer of plaster. The basement is an artificial stone of the Aztec company with an area of ​ ​ 963 m ².

The exterior decoration of the hotel is made of decorative and protective plaster, the cladding is an artificial stone of the Aztec company with an area of ​ ​ 963 m ².

Interior decoration - improved plaster, color with water-dispersed paints.

Living rooms, sleeping rooms, hallways - wallpaper of improved quality.

Bathrooms in rooms, MOS room, bathrooms, shower, linen - plaster, glazed tiles.

The building of the hotel - corridor type, rooms are located on two sides of the corridor, where there are light halls .

Bathrooms are designed on all floors. The floors are connected by 3 dispersed staircases of type L 1.

Explosion and fire safety measures.

Evacuation of people in the hotel is provided for 3 staircases in each section of type L-1. The type of staircase in residential buildings is L-1.

Clearance in plan width in light not less than 75 mm is provided between walks and handrails of staircase fences.

Natural lighting of evacuation staircases is provided through windows. It is provided to open the doors along the escape route. The protection of the hard-burning polystyrene foam insulation used for insulation of attic floors is provided with a cement cloth brace with a thickness of at least 40 mm.

From the technical underground of the section there is an exit directly outside, separate from the exits from the building.

In areas of the roof with the height of the parapet less than 600 mm to provide the required GOST 2577283 * height of the parapet, a metal fence of pipes is provided.

The design documentation provides for the use of prefabricated reinforced concrete structures with a sufficient protective layer of concrete before reinforcement:

- intermediate floors have fire resistance rating REI 60 (floor thickness 220 mm and distance to reinforcement center 39 mm);

- stairways have fire resistance limit R 60 (structure thickness 160 mm distance to reinforcement center 30 mm);

- bearing brick walls and walls of staircases - (thickness 380 mm) have a fire resistance rating of more than 5.5 hours;

- protection of structural steel elements is performed by layer of plaster with thickness of 30 mm along reinforcement mesh.

Drawings content

icon КРОВЛЯ, ПЛАН ТИПОВОГО ЭТАЖА.dwg

КРОВЛЯ, ПЛАН ТИПОВОГО ЭТАЖА.dwg

icon ПЛАН_1,2.dwg

ПЛАН_1,2.dwg

icon РАЗРЕЗЫ.dwg

РАЗРЕЗЫ.dwg

icon ФАСАД.dwg

ФАСАД.dwg

icon Экспликация 1 этажа.dwg

Экспликация 1 этажа.dwg

icon Экспликация 2 этажа.dwg

Экспликация 2 этажа.dwg

icon Экспликация типового этажа.dwg

Экспликация типового этажа.dwg

icon dr01.dwg

dr01.dwg

icon dr02.dwg

dr02.dwg

icon r06p220.dwg

r06p220.dwg

icon r07p220.dwg

r07p220.dwg

icon Лестничный марш с площадкой.dwg

Лестничный марш с площадкой.dwg

icon Перекрытие.dwg

Перекрытие.dwg

icon основание ифундаменты.dwg

основание ифундаменты.dwg

icon СГП,техкарта,кал.план.dwg

СГП,техкарта,кал.план.dwg

icon сравнение1.dwg

сравнение1.dwg
up Up