• RU
  • icon Waiting For Moderation: 21
Menu

Coursework on kindergarten ventilation

  • Added: 27.04.2015
  • Size: 2 MB
  • Downloads: 0
Find out how to download this material

Description

Coursework on kindergarten ventilation. All calculations and drawings.

Project's Content

icon
icon
icon
icon Дет.сад на Сивкова.dwg
icon моя записка.doc
icon Пояснительная записка.doc
icon расчеты вен.xls
icon чертежи.dwg

Additional information

Contents

Contents

I. Design Input

II. Determination of hazards from spectators in the auditorium of the club

III. Determination of moisture, heat and gas emissions in the auditorium

IV. Basic design solutions of plenum and exhaust ventilation systems

V. Definition of air exchanges in the auxiliary rooms of the club

VI. Calculation of plenum adjustable grids of PP type

VII.Recalculation of deflectors

VIII. Calculation and selection of filters

IX. Calorifer calculation

X. Development of plenum chamber P

XI. Aerodynamic calculation of ducts

I. Calculation of the mechanical plenum system of the auditorium

II. Calculation of natural exhaust system

III. Calculation of mechanical exhaust system

XII.Aerodynamic grid calculation

XIII.Addition of diaphragm for plenum system

XIV. Approximate calculation of mechanical systems

XV. Selection of fans for all mechanical systems

XVI. Calculation of silencer

List of literature

Application

Design Input

1. The location is the city of Kaunas.

2.Barometric pressure = 990 GPa.

3. For the warm period:

- design temperature (tan) is =21.2 wasps.

- heat content of air (Ja) = 48.6 kJ/kg .

- wind speed (Va) = 1 m/s.

4. For the cold period:

- design temperature (tbn) = 22 wasps.

- heat content (Jb) = 20.8 kJ/kg.

- wind speed (Vb) = 3.5 m/s.

6. CO2 concentration in outdoor air = 0.23 g/kg.

7. Dust content of outdoor air = 4 mg/m3.

8. Orientation on the main facade - CB.

9. Parameters of the heat carrier of the OS thermal networks 13570.

10. The compatibility of the auditorium is 220 people.

Fundamental design solutions

SUPPLY AND EXHAUST VENTILATION SYSTEMS.

The structural solution of the scheme of organization of air exchange in the auditoriums should be organically connected with the volume and layout solutions of the hall. In addition, the air exchange organization scheme should be adopted taking into account the working temperature difference between the supplied supply air and air in the area of ​ ​ spectators (working zone) in the cold period of the year and taking into account the design features of the auditorium.

For auditoriums, clubs and cinemas with 150600 seats, plenum ventilation systems with a mechanical impulse of air movement are designed, operating in the warm period of the year in the outside air, and in the cold period with partial recirculation. Exhaust ventilation systems may be naturally or mechanically induced. The clubs design a common plenum system of the auditorium and scenes, separate exhaust systems. Supply air is supplied to the stage due to overpressure in the hall created by the supply system. Through the stage, 17% should be removed, and through the auditorium 83% of the total volume of air removed from the hall. The rest of the air shall be removed through recirculation and exhaust devices of the auditorium.

Mechanical exhaust from the block of film projection and other technical rooms is designed in the building.

Natural exhaust ventilation is provided from the auditorium, stage premises, as well as from separate or separate administrative and economic premises.

Drawings content

icon Дет.сад на Сивкова.dwg

Дет.сад на Сивкова.dwg

icon чертежи.dwg

чертежи.dwg

Free downloading for today

Update after: 20 hours 12 minutes
up Up