Chimney Design - Drawings

- Added: 29.07.2014
- Size: 5 MB
- Downloads: 0
Description
Project's Content
![]() |
![]() |
![]() |
![]() ![]() ![]() ![]() |
![]() |
![]() ![]() ![]() ![]() |
![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() |
![]() ![]() ![]() |
![]() ![]() ![]() |
![]() ![]() ![]() |
![]() |
![]() ![]() ![]() |
Additional information
General Instructions
Smoke removal
Smoke removal ventilation includes:
- smoke removal from the basement and from each floor of the building (DC1, DC2 system);
In case of fire, the electrical part of the project provides for automatic disconnection of all ventilation systems in case of fire and activation of smoke removal systems.
Air ducts of DN1, DN2 systems are covered with fire-retardant insulation, providing the required fire resistance limit EI 30.
Work Requirements
Install ventilation systems in accordance with the requirements of SNiP 3.05.0185 "Internal sanitary and technical systems."
Installation of fire-retardant coating of air ducts from mineral wool mats shall be performed in accordance with the process regulations.
Testing and adjustment of smoke removal systems shall be performed in accordance with the requirements of SNiP 3.05.0185 "Internal sanitary and technical systems" at full load .
БУРАН_план-схема.dwg

БУРАН_планы_дымоудаления_от_20_11_2006.dwg

БУРАН_схема_дымоудаления_от_20_11_2006.dwg