PWP for installation of chimney - installation diagrams, construction plan
- Added: 09.07.2014
- Size: 9 MB
- Downloads: 1
Description
Project's Content
|
|
|
! ТК монтаж люков и патруб на стенке и крыше.doc
|
!!_Dу 150 мм максим уровня.dwg
|
!!_Люк-лаз 600х900 в1 поясе.dwg
|
!!_Люк-лаз Ду 600 мм в 1 поясе.dwg
|
!!_Люк монтажный.dwg
|
!!_люк свет.dwg
|
!!_П_Патрубок для зачистки-изм2.dwg
|
!!_патрубок монтажный 500.dwg
|
!!_Патрубок Ду 150 мм для люка замерного.dwg
|
!!_Патрубок приемо-раздаточный 500.dwg
|
!!_Подсл пп 150.dwg
|
!!_схема расположения люков и патрубков.dwg
|
! 04 ТК монтаж люков и патруб на стенке и крыше.pdf
|
|
0 ТК на монтаж стенки резервуара.doc
|
19-23.doc
|
1-18 ТК на монтаж стенки.dwg
|
! 02 Тк на монтаж стенки.pdf
|
01 Текст.pdf
|
01 ТК на монтаж стенки Model (1).pdf
|
02 ТК на монтаж стенки Model (1).pdf
|
03 ТК на монтаж стенки Model (1).pdf
|
04 ТК на монтаж стенки Model (1).pdf
|
05 ТК на монтаж стенки Model (1).pdf
|
06 ТК на монтаж стенки Model (1).pdf
|
07 ТК на монтаж стенки Model (1).pdf
|
08 ТК на монтаж стенки Model (1).pdf
|
09 ТК на монтаж стенки Model (1).pdf
|
10 ТК на монтаж стенки Model (1).pdf
|
11 ТК на монтаж стенки Model (1).pdf
|
12 ТК на монтаж стенки Model (1).pdf
|
13 ТК на монтаж стенки Model (1).pdf
|
14 ТК на монтаж стенки Model (1).pdf
|
15 ТК на монтаж стенки Model (1).pdf
|
16 ТК на монтаж стенки Model (1).pdf
|
17 ТК на монтаж стенки Model (1).pdf
|
18 ТК на монтаж стенки Model (1).pdf
|
19 ТК на монтаж стенки Model (1).pdf
|
|
ТК монтаж металлоконструкций крыши резервуара.doc
|
16_Крыша_монт_схема.2002dwg.dwg
|
! 03 ТК на монтаж кровли.pdf
|
00 ТК монтаж металлоконструкций крыши резервуара.pdf
|
01 схема.pdf
|
02 схема.pdf
|
03 схема.pdf
|
04 схема.pdf
|
05 схема.pdf
|
06 схема.pdf
|
07 схема.pdf
|
08 схема.pdf
|
09 схема.pdf
|
10 схема.pdf
|
|
тк.doc
|
+++++.dwg
|
43_Кольцевая площадка обслуживания.dwg
|
44_45_Площадка люка замерного_уровнемера.dwg
|
! 05 ТК на монтаж кронштейнов.pdf
|
01.pdf
|
02.pdf
|
03.pdf
|
04.pdf
|
05.pdf
|
тк.rtf
|
|
тк.doc
|
1.dwg
|
! 01 тк на монтаж днища.pdf
|
1.pdf
|
10.pdf
|
11.pdf
|
12.pdf
|
13.pdf
|
14.pdf
|
2.pdf
|
3.pdf
|
4.pdf
|
5.pdf
|
6.pdf
|
7.pdf
|
8.pdf
|
9.pdf
|
opis.txt
|
Additional information
Contents
General requirements
Procedure of works execution
Need for machines and process equipment
Composition of the brigade
Occupational Safety, Industrial and Fire Safety Solutions
Operational Quality Control Diagram
1 General requirements
1.1. This Job Instruction (hereinafter referred to as JI) has been developed for installation of PVS5000 No. 2 tank wall at Ishimbay Tank Farm No. 2 "Agidel-Petroleum Services"
1.2 Works are carried out during the construction of PVS5000m3 No. 2 and are carried out according to the project No. 55102PR07 "Agidelnefteproductservice LLC" Vertical Steel Tank with Stationary Roof 5000m3, "developed by OOO EPC" Pipeline Services. "
1.3. Before commencing work, familiarize (under painting) with this TC to persons responsible for the safe performance of work with cranes, lifts (Article Brethren, Foreman, Foreman), crane operators, drivers, slings and other workers engaged in work.
5 Occupational Safety, Industrial and Fire Safety Solutions
5.1. Perform the following actions before starting work:
- from among the ITR to appoint persons by order of the enterprise. responsible for safe performance of works:
- conduct an introductory and initial training of workers on OT by the customer's representative;
- in the fire department conduct induction training of workers with recording in the instruction log and target instruction with recording in the work permit:
- shield the work area with signal tape on wooden supports or for existing structures (tape height 1.2 m, support spacing 5-9 m). If there are existing cables in the working area, display posters;
- obtain work permit for fire, gas-hazardous and high-risk operations:
- a person obliged to perform analysis of the gas-air medium (laboratory technicians of the operating organization and contracting organization. appointed the joint order) to make the analysis of the air environment of a pas lack of explosive concentration of gas (concentration of hydrocarbons of oil is not higher than the maximum allowable concentration of 300 mg/m3 a gas analyzer of "AHT2M (ZM)". The location of the WAN analysis shall be determined by the person issuing the work permit. The WAN analysis shall be carried out before the commencement of works, after interruptions in operation and during works with the periodicity specified in the work permit depending on specific conditions, but not less than after 0.5 hours;
- fire works workplace is equipped with the following primary fire extinguishing equipment:
- felt or asbestos canvas with a size of 2x2 m -2 pieces:
- OP10 fire extinguishers - 2 pieces or OP50;
- shovels, axes, crowns - 2 sets:
- Each piece of equipment is equipped with:
- the car - the fire extinguisher uglekislotyjsh OU5 of 2 pieces:
- the truck crane - the fire extinguisher carbon dioxide OU5 - 2 pieces:
- construction, lifting, automotive equipment and units with ICE - production systems are equipped with spark arresters.
5.2. During installation works, measures are provided to prevent exposure of the employee to the following hazardous and harmful production factors related to the nature of the work:
- location of workplaces in the vicinity of the difference in height 1.3 m or more (workplaces are enclosed along the perimeter by signal tape on wooden supports):
overturning of machines, falling of their parts (shield the place of work of construction equipment with a signal tape);
increased voltage of the electrical circuit, closure of which can occur through the human body (installation of protective shutdown devices, grounding of all equipment).
5.3. During the works, the working ones are provided with the following protective equipment:
- helmets (26 pcs.);
- tracksuit of IR (2 sets);
- suit x/b (18 sets);
- canvas suit (6 sets);
- hoses x/b (20 pairs):
- tarpaulins (6 pairs);
- boots (26 pairs).
!!_Dу 150 мм максим уровня.dwg
!!_Люк-лаз 600х900 в1 поясе.dwg
!!_Люк-лаз Ду 600 мм в 1 поясе.dwg
!!_Люк монтажный.dwg
!!_люк свет.dwg
!!_П_Патрубок для зачистки-изм2.dwg
!!_патрубок монтажный 500.dwg
!!_Патрубок Ду 150 мм для люка замерного.dwg
!!_Патрубок приемо-раздаточный 500.dwg
!!_Подсл пп 150.dwg
!!_схема расположения люков и патрубков.dwg
1-18 ТК на монтаж стенки.dwg
16_Крыша_монт_схема.2002dwg.dwg
+++++.dwg
43_Кольцевая площадка обслуживания.dwg
44_45_Площадка люка замерного_уровнемера.dwg
1.dwg
Similar materials
- 09.07.2014