• RU
  • icon Waiting For Moderation: 1
Menu

PWP for installation of chimney - installation diagrams, construction plan

  • Added: 09.07.2014
  • Size: 9 MB
  • Downloads: 1
Find out how to download this material

Description

PPR for installation of RVS-5000Proofing tank: 01 JI for installation of bottom 02 JI for installation of wall 03 JI for installation of roof 04 JI for installation of panels and branch pipes 05 JI for installation of service platforms and brackets

Project's Content

icon
icon
icon
icon ! ТК монтаж люков и патруб на стенке и крыше.doc
icon !!_Dу 150 мм максим уровня.dwg
icon !!_Люк-лаз 600х900 в1 поясе.dwg
icon !!_Люк-лаз Ду 600 мм в 1 поясе.dwg
icon !!_Люк монтажный.dwg
icon !!_люк свет.dwg
icon !!_П_Патрубок для зачистки-изм2.dwg
icon !!_патрубок монтажный 500.dwg
icon !!_Патрубок Ду 150 мм для люка замерного.dwg
icon !!_Патрубок приемо-раздаточный 500.dwg
icon !!_Подсл пп 150.dwg
icon !!_схема расположения люков и патрубков.dwg
icon ! 04 ТК монтаж люков и патруб на стенке и крыше.pdf
icon
icon 0 ТК на монтаж стенки резервуара.doc
icon 19-23.doc
icon 1-18 ТК на монтаж стенки.dwg
icon ! 02 Тк на монтаж стенки.pdf
icon 01 Текст.pdf
icon 01 ТК на монтаж стенки Model (1).pdf
icon 02 ТК на монтаж стенки Model (1).pdf
icon 03 ТК на монтаж стенки Model (1).pdf
icon 04 ТК на монтаж стенки Model (1).pdf
icon 05 ТК на монтаж стенки Model (1).pdf
icon 06 ТК на монтаж стенки Model (1).pdf
icon 07 ТК на монтаж стенки Model (1).pdf
icon 08 ТК на монтаж стенки Model (1).pdf
icon 09 ТК на монтаж стенки Model (1).pdf
icon 10 ТК на монтаж стенки Model (1).pdf
icon 11 ТК на монтаж стенки Model (1).pdf
icon 12 ТК на монтаж стенки Model (1).pdf
icon 13 ТК на монтаж стенки Model (1).pdf
icon 14 ТК на монтаж стенки Model (1).pdf
icon 15 ТК на монтаж стенки Model (1).pdf
icon 16 ТК на монтаж стенки Model (1).pdf
icon 17 ТК на монтаж стенки Model (1).pdf
icon 18 ТК на монтаж стенки Model (1).pdf
icon 19 ТК на монтаж стенки Model (1).pdf
icon
icon ТК монтаж металлоконструкций крыши резервуара.doc
icon 16_Крыша_монт_схема.2002dwg.dwg
icon ! 03 ТК на монтаж кровли.pdf
icon 00 ТК монтаж металлоконструкций крыши резервуара.pdf
icon 01 схема.pdf
icon 02 схема.pdf
icon 03 схема.pdf
icon 04 схема.pdf
icon 05 схема.pdf
icon 06 схема.pdf
icon 07 схема.pdf
icon 08 схема.pdf
icon 09 схема.pdf
icon 10 схема.pdf
icon
icon тк.doc
icon +++++.dwg
icon 43_Кольцевая площадка обслуживания.dwg
icon 44_45_Площадка люка замерного_уровнемера.dwg
icon ! 05 ТК на монтаж кронштейнов.pdf
icon 01.pdf
icon 02.pdf
icon 03.pdf
icon 04.pdf
icon 05.pdf
icon тк.rtf
icon
icon тк.doc
icon 1.dwg
icon ! 01 тк на монтаж днища.pdf
icon 1.pdf
icon 10.pdf
icon 11.pdf
icon 12.pdf
icon 13.pdf
icon 14.pdf
icon 2.pdf
icon 3.pdf
icon 4.pdf
icon 5.pdf
icon 6.pdf
icon 7.pdf
icon 8.pdf
icon 9.pdf
icon opis.txt

Additional information

Contents

General requirements

Procedure of works execution

Need for machines and process equipment

Composition of the brigade

Occupational Safety, Industrial and Fire Safety Solutions

Operational Quality Control Diagram

1 General requirements

1.1. This Job Instruction (hereinafter referred to as JI) has been developed for installation of PVS5000 No. 2 tank wall at Ishimbay Tank Farm No. 2 "Agidel-Petroleum Services"

1.2 Works are carried out during the construction of PVS5000m3 No. 2 and are carried out according to the project No. 55102PR07 "Agidelnefteproductservice LLC" Vertical Steel Tank with Stationary Roof 5000m3, "developed by OOO EPC" Pipeline Services. "

1.3. Before commencing work, familiarize (under painting) with this TC to persons responsible for the safe performance of work with cranes, lifts (Article Brethren, Foreman, Foreman), crane operators, drivers, slings and other workers engaged in work.

5 Occupational Safety, Industrial and Fire Safety Solutions

5.1. Perform the following actions before starting work:

- from among the ITR to appoint persons by order of the enterprise. responsible for safe performance of works:

- conduct an introductory and initial training of workers on OT by the customer's representative;

- in the fire department conduct induction training of workers with recording in the instruction log and target instruction with recording in the work permit:

- shield the work area with signal tape on wooden supports or for existing structures (tape height 1.2 m, support spacing 5-9 m). If there are existing cables in the working area, display posters;

- obtain work permit for fire, gas-hazardous and high-risk operations:

- a person obliged to perform analysis of the gas-air medium (laboratory technicians of the operating organization and contracting organization. appointed the joint order) to make the analysis of the air environment of a pas lack of explosive concentration of gas (concentration of hydrocarbons of oil is not higher than the maximum allowable concentration of 300 mg/m3 a gas analyzer of "AHT2M (ZM)". The location of the WAN analysis shall be determined by the person issuing the work permit. The WAN analysis shall be carried out before the commencement of works, after interruptions in operation and during works with the periodicity specified in the work permit depending on specific conditions, but not less than after 0.5 hours;

- fire works workplace is equipped with the following primary fire extinguishing equipment:

- felt or asbestos canvas with a size of 2x2 m -2 pieces:

- OP10 fire extinguishers - 2 pieces or OP50;

- shovels, axes, crowns - 2 sets:

- Each piece of equipment is equipped with:

- the car - the fire extinguisher uglekislotyjsh OU5 of 2 pieces:

- the truck crane - the fire extinguisher carbon dioxide OU5 - 2 pieces:

- construction, lifting, automotive equipment and units with ICE - production systems are equipped with spark arresters.

5.2. During installation works, measures are provided to prevent exposure of the employee to the following hazardous and harmful production factors related to the nature of the work:

- location of workplaces in the vicinity of the difference in height 1.3 m or more (workplaces are enclosed along the perimeter by signal tape on wooden supports):

overturning of machines, falling of their parts (shield the place of work of construction equipment with a signal tape);

increased voltage of the electrical circuit, closure of which can occur through the human body (installation of protective shutdown devices, grounding of all equipment).

5.3. During the works, the working ones are provided with the following protective equipment:

- helmets (26 pcs.);

- tracksuit of IR (2 sets);

- suit x/b (18 sets);

- canvas suit (6 sets);

- hoses x/b (20 pairs):

- tarpaulins (6 pairs);

- boots (26 pairs).

Drawings content

icon !!_Dу 150 мм максим уровня.dwg

!!_Dу 150 мм максим уровня.dwg

icon !!_Люк-лаз 600х900 в1 поясе.dwg

!!_Люк-лаз 600х900 в1 поясе.dwg

icon !!_Люк-лаз Ду 600 мм в 1 поясе.dwg

!!_Люк-лаз Ду 600 мм в 1 поясе.dwg

icon !!_Люк монтажный.dwg

!!_Люк монтажный.dwg

icon !!_люк свет.dwg

!!_люк свет.dwg

icon !!_П_Патрубок для зачистки-изм2.dwg

!!_П_Патрубок для зачистки-изм2.dwg

icon !!_патрубок монтажный 500.dwg

!!_патрубок  монтажный 500.dwg

icon !!_Патрубок Ду 150 мм для люка замерного.dwg

!!_Патрубок Ду 150 мм для люка замерного.dwg

icon !!_Патрубок приемо-раздаточный 500.dwg

!!_Патрубок приемо-раздаточный 500.dwg

icon !!_Подсл пп 150.dwg

!!_Подсл пп 150.dwg

icon !!_схема расположения люков и патрубков.dwg

!!_схема расположения люков и патрубков.dwg

icon 1-18 ТК на монтаж стенки.dwg

1-18 ТК на монтаж стенки.dwg

icon 16_Крыша_монт_схема.2002dwg.dwg

16_Крыша_монт_схема.2002dwg.dwg

icon +++++.dwg

+++++.dwg

icon 43_Кольцевая площадка обслуживания.dwg

43_Кольцевая площадка обслуживания.dwg

icon 44_45_Площадка люка замерного_уровнемера.dwg

44_45_Площадка  люка замерного_уровнемера.dwg

icon 1.dwg

1.dwg
up Up