• RU
  • icon Waiting For Moderation: 17
Menu

TTK Installation of reinforced concrete columns of industrial buildings - typical process flow sheet

  • Added: 24.04.2014
  • Size: 171 KB
  • Downloads: 2
Find out how to download this material

Description

The archive contains a file with a complete technical map in doc format (Microsoft Word) or in pdf format.

Project's Content

icon
icon 234.doc
up Up