• RU
  • icon Waiting For Moderation: 0
Menu

TTK construction of cast-in-situ reinforced concrete walls of basements up to 6 m high and up to 500 mm thick of general-purpose buildings and structures - typical process flow sheet

  • Added: 24.04.2014
  • Size: 520 KB
  • Downloads: 1
Find out how to download this material

Description

The archive contains a file with a complete technical map in doc format (Microsoft Word) or in pdf format.

Project's Content

icon
icon 344.doc
up Up