• RU
  • icon Waiting For Moderation: 1
Menu

TTK construction of cast-in-situ reinforced concrete walls of basements up to 6 m high and up to 500 mm thick of general-purpose buildings and structures - typical process flow sheet

Description

The archive contains a file with a complete technical map in doc format (Microsoft Word) or in pdf format.

Project's Content

icon
icon 344.doc
The material is an archive with files that can be opened in programs:
  • Microsoft Word
up Up