RU
Waiting For Moderation:
19
en
Русский - RU
Login
Create an account
Menu
AllDrawings
Drawings
Pictures
Subscription
Feedback
Drawings
Drawings content
Pictures
Total:
71976
Advanced search
Search in files:
Drawings
Standard Documentation
TTK
Zero cycle
Zero cycle
05.02.2022
Course project on the discipline of technology of construction of engineering structures
01.06.2014
MGSU Exchange Rate Project on Foundations and Foundations
24.04.2014
TTC Reinforcement of slopes with reinforced concrete split slabs - typical process flow sheet
24.04.2014
TTK Backfilling, leveling and compaction of soil in trench with two pipelines at the same level - typical Job Instruction
24.04.2014
TTK Arrangement of pile foundations for VL 35-500 kV supports on swamps - typical Job Instruction
24.04.2014
TTK Reinforcement of slopes with lattice structures - typical process flow sheet
24.04.2014
TTK of pit arrangement for industrial building - typical Job Instruction
24.04.2014
TTK Strengthening of embankment slopes at small bridges and overpasses by P-1 units - typical Job Instruction
24.04.2014
TTK backfilling, leveling and compaction of soil inside the building for floors (typical Job Instruction): archive
24.04.2014
TTK on technology a betonirovniya in the bezobogrevatelny way of monolithic columns - the standard checklist
24.04.2014
TTK Development of excavations with a frontal face by an excavator E0-3322B equipped with a reverse shovel and loading of soil into dump trucks - typical process flow sheet
24.04.2014
TTK Strengthening of peat-sand mixture slopes - typical process flow sheet
24.04.2014
TTK Repair works at deformation of bottom foundation - typical Job Instruction
24.04.2014
TTC strengthening of slopes by sowing of perennial grasses (typical Job Instruction)
24.04.2014
TTK Installation of bored piles in winter time - typical Job Instruction
24.04.2014
TTK on arrangement of artificial bases of external networks and low-rise buildings on bulk soils - typical process flow sheet
1
2
3
4
5
>
>>
Up