RU
Waiting For Moderation:
7
en
Русский - RU
Login
Create an account
Menu
AllDrawings
Drawings
Pictures
Subscription
Feedback
Drawings
Drawings content
Pictures
Total:
72434
Advanced search
Search in files:
dwg
cdw
frw
spw
doc
docx
pdf
Drawings
Standard Documentation
TTK
Zero cycle
Zero cycle
05.02.2022
Course project on the discipline of technology of construction of engineering structures
01.06.2014
MGSU Exchange Rate Project on Foundations and Foundations
24.04.2014
TTK Backfill, leveling and compaction of soil in trench with collector - typical Job Instruction
24.04.2014
TTK pit arrangement for foundations in wet soils (typical process flow sheet): archive
24.04.2014
TTK Strengthening of slopes of hydroaxial perennial grasses with mulching - typical process flow sheet
24.04.2014
TTK Construction of load-bearing wall in soil from cast-in-situ reinforced concrete during soil development by excavator equipped with grab bucket - typical Job Instruction
24.04.2014
TTK Reinforcement of slopes and cones by single paving on cement mortar - typical process flow sheet
24.04.2014
TTK Loosening of frozen soil by DP-9S-1 loosener based on DET-250M tractor - typical Job Instruction
24.04.2014
TTK installation of foundation blocks (typical Job Instruction)
24.04.2014
TTK Dipping of reinforced concrete piles by drilling and driving method - typical Job Instruction
24.04.2014
TTK Loading into dump trucks of loose materials from the stack with excavator EO-3322B with working equipment of direct digging - typical Job Instruction
24.04.2014
TTK Production of bored piles using casing pipes - typical Job Instruction
24.04.2014
TTK Water lowering device (variant study) - typical Job Instruction
24.04.2014
TTK construction of columnar monolithic reinforced concrete foundations with volume of 5, 10, 25 m3 or more for steel columns of single-storey industrial buildings - typical process flow sheet
24.04.2014
TTK strengthening of slopes with crushed stone, wood, gravel-pebble or clay soils (typical process flow sheet): archive
24.04.2014
TTK Development of trenches by ETR-134 excavator - typical process flow sheet
1
2
3
4
5
>
>>
Up