Zero cycle (the 3 page from 6)
Zero cycle
24.04.2014
TTK Excavation with frontal face by excavator E0-3322B equipped with reverse blade and loading of soil into dump - typical Job Instruction
24.04.2014
TTK Reinforcement with cast-in-situ concrete of slopes of embankments and cones of small bridges - typical process flow sheet
24.04.2014
TTK Reinforcement of slopes by shedding in a cage - typical process flow sheet
24.04.2014
TTK Development of dump from soil of group 2 - typical Job Instruction
24.04.2014
TTK Development of trenches in Group II soils by ETTs-252 excavator - typical process flow sheet
24.04.2014
TTK device of a tongue-and-groove protection of a ditch (standard checklist)
24.04.2014
TTK Performance of works during installation of vertical painting and adhesive waterproofing of foundation walls - typical process flow sheet
24.04.2014
TTK Reinforcement of slopes with concrete slabs - typical process flow sheet
24.04.2014
TTK According to the technology of heating-free concreting of monolithic structures using thermos and accelerated thermos - typical Job Instruction
24.04.2014
TTK Backfilling, leveling and compaction of soil in trench with two pipelines at the same level - typical Job Instruction
24.04.2014
TTC Reinforcement of slopes with reinforced concrete split slabs - typical process flow sheet
24.04.2014
TTK of pit arrangement for industrial building - typical Job Instruction
24.04.2014
TTK Arrangement of pile foundations for VL 35-500 kV supports on swamps - typical Job Instruction
24.04.2014
TTK Reinforcement of slopes with lattice structures - typical process flow sheet
24.04.2014
TTK Strengthening of embankment slopes at small bridges and overpasses by P-1 units - typical Job Instruction
24.04.2014
TTK backfilling, leveling and compaction of soil inside the building for floors (typical Job Instruction): archive
<<
<