• RU
  • icon Waiting For Moderation: 27
Menu

TTK Backfilling, leveling and compaction of soil in trench with two pipelines at the same level - typical Job Instruction

  • Added: 24.04.2014
  • Size: 361 KB
  • Downloads: 0
Find out how to download this material

Description

The archive contains a file with a complete technical map in doc format (Microsoft Word) or in pdf format.

Project's Content

icon
icon 299.doc
up Up