• RU
  • icon Waiting For Moderation: 9
Menu

TTK Backfilling, leveling and compaction of soil in trench with two pipelines at the same level - typical Job Instruction

Description

The archive contains a file with a complete technical map in doc format (Microsoft Word) or in pdf format.

Project's Content

icon
icon 299.doc
The material is an archive with files that can be opened in programs:
  • Microsoft Word

Free downloading for today

Update after: 20 hours 52 minutes
up Up