• RU
  • icon Waiting For Moderation: 6
Menu

TTK Construction of load-bearing wall in soil from cast-in-situ reinforced concrete during soil development by excavator equipped with grab bucket - typical Job Instruction

  • Added: 24.04.2014
  • Size: 2 MB
  • Downloads: 1
Find out how to download this material

Description

The archive contains a file with a complete technical map in doc format (Microsoft Word) or in pdf format.

Project's Content

icon
icon 345.pdf
up Up