• RU
  • icon Waiting For Moderation: 8
Menu

TTK backfilling, leveling and compaction of soil inside the building for floors (typical Job Instruction): archive

Description

The archive contains a file with a complete technical map in doc format (Microsoft Word) or in pdf format.

Project's Content

icon
icon 301.doc

Free downloading for today

Update after: 12 hours 10 minutes