• RU
  • icon Waiting For Moderation: 19
Menu

TTK Backfilling, leveling and compaction of soil inside the building for floors - typical Job Instruction

  • Added: 24.04.2014
  • Size: 1 MB
  • Downloads: 0
Find out how to download this material

Description

The archive contains a file with a complete technical map in doc format (Microsoft Word) or in pdf format.

Project's Content

icon
icon 425.rtf
up Up