RU
Waiting For Moderation:
5
en
Русский - RU
Login
Create an account
Menu
AllDrawings
Drawings
Pictures
Subscription
Feedback
Drawings
Drawings content
Pictures
Total:
72542
Advanced search
Search in files:
dwg
cdw
frw
spw
doc
docx
pdf
Drawings
Standard Documentation
TTK
Zero cycle (the 5 page from 6)
Zero cycle
24.04.2014
TTK K-4-21-1. Pit Breakdown - Typical Routing
24.04.2014
TR 100-99 on arrangement of foundations from bored piles in conditions - technical recommendations
24.04.2014
VSN 200-83 Manual for zero-cycle work during the construction of residential buildings
24.04.2014
TTK 4.01.01.61 - Construction of columnar foundations - typical Job Instruction
24.04.2014
TTK 1.04.01.40. Complex-mechanized process of rocky soil development in construction quarry - typical process flow sheet
24.04.2014
TTC Erection of embankments from imported soil (soil is developed by excavators in excavations or quarries, transported by cars) - a typical technological map
24.04.2014
TTK For construction of columnar monolithic foundations using small-panel formwork - typical Job Instruction
24.04.2014
TTK for installation of cast-in-situ core of foundation slab - typical Job Instruction
24.04.2014
TTC Complex-mechanized process of vertical planning of the construction site on the paved area - typical process flow sheet
24.04.2014
TTK Erection of monolithic foundations for steel columns - typical Job Instruction
24.04.2014
VSN 37-96 Guidelines for the construction of foundations on a natural basis during the construction of residential buildings up to
24.04.2014
TTK (typical process flow sheet) vertical waterproofing of foundation slab (underground part): archive
24.04.2014
VSN 490-87 design and construction of pile foundations and sheet fences in the conditions of reconstruction of industrial enterprises and urban development
24.04.2014
TTK 1.01.01.41. Complex-mechanized process of group III soil development in the construction quarry - typical process flow sheet
24.04.2014
VSN 38-96 Instructions for earthworks at housing and civil construction, implemented
24.04.2014
VSN 240-88 Instruction on waterproofing technology with polyethylene sheets of monolithic underground structures of type A
<<
<
2
3
4
5
6
>
>>
Up