• RU
  • icon Waiting For Moderation: 6
Menu

TTC Erection of embankments from imported soil (soil is developed by excavators in excavations or quarries, transported by cars) - a typical technological map

  • Added: 24.04.2014
  • Size: 115 KB
  • Downloads: 0
Find out how to download this material

Description

The archive contains a file with a complete technical map in doc format (Microsoft Word) or in pdf format.

Project's Content

icon
icon 286.doc
up Up