• RU
  • icon Waiting For Moderation: 20
Menu

TTC Erection of roadbed using peat at the bottom of the embankment and application of geotextile (non-woven synthetic) material - typical process flow sheet

  • Added: 24.04.2014
  • Size: 258 KB
  • Downloads: 1
Find out how to download this material

Description

The archive contains a file with a complete technical map in doc format (Microsoft Word) or in pdf format.

Project's Content

icon
icon 451.rtf

Free downloading for today

Update after: 13 hours 51 minutes
up Up