TTC complex-mechanized process for backfilling of pit with foundations of industrial workshop with soil of 2 groups (typical process flow sheet): archive
- Added: 24.04.2014
- Size: 1 MB
- Downloads: 0
Find out how to download this material
Subscribe to receive an information about new materials:
Description
The archive contains a file with a complete technical map in doc format (Microsoft Word) or in pdf format.
Project's Content
|
290.doc
|
Similar materials
- 24.04.2014
- 24.04.2014
- 24.04.2014
- 24.04.2014
- 24.04.2014
- 24.04.2014
- 24.04.2014
Free downloading for today
Update after: 5 hours 18 minutes