• RU
  • icon Waiting For Moderation: 6
Menu

TTK complex-mechanized process for backfilling of pit with foundations of industrial workshop with soil of groups 2 (typical process flow sheet)

  • Added: 24.04.2014
  • Size: 387 KB
  • Downloads: 0
Find out how to download this material

Description

The archive contains a file with a complete technical map in doc format (Microsoft Word) or in pdf format.

Project's Content

icon
icon 106.doc
up Up