RU
Waiting For Moderation:
20
en
Русский - RU
Login
Create an account
Menu
AllDrawings
Drawings
Pictures
Subscription
Feedback
Drawings
Drawings content
Pictures
Total:
72296
Advanced search
Search in files:
dwg
cdw
frw
spw
doc
docx
pdf
Drawings
Standard Documentation
TTK
Earthworks
Earthworks
17.04.2023
Design of foundations and foundations of a multi-storey residential building
06.03.2023
Technological map for the production of earthworks - Technology of Construction Production
17.02.2023
Two-storey cottage with columns in revit
05.02.2022
Course project on the discipline of technology of construction of engineering structures
17.02.2018
Plough disk general view
26.12.2017
Development of equipment for excavator E0-3323
14.12.2017
Excavator-loader Belarus
04.12.2014
Routing for Trench Development
24.04.2014
TTK Process Sheet for Soil Development in Pit - Typical Process Sheet
24.04.2014
TTK Development of trenches in soils of group 2 by excavator etts-252 - typical process flow sheet
24.04.2014
TTK complex-mechanized process for backfilling of pit with foundations of industrial workshop with soil of groups 2 (typical process flow sheet)
24.04.2014
TTK Excavation by the pubic face of the excavator eo-3322b, equipped with a reverse shovel and loading of the soil of the dump truck - typical process flow sheet
24.04.2014
TTK backfilling, leveling and compaction of soil inside the building for floors (typical Job Instruction)
24.04.2014
TTK device of a tongue-and-groove protection of a ditch (standard checklist): archive
24.04.2014
TTK Development of trenches and pits - typical process flow sheet
24.04.2014
TTK Performance of works during the development of pits by mechanized method for the construction of residential and public buildings - typical process flow sheet
1
2
3
>
>>
Up