RU
Waiting For Moderation:
20
en
Русский - RU
Login
Create an account
Menu
AllDrawings
Drawings
Pictures
Subscription
Feedback
Drawings
Drawings content
Pictures
Total:
72314
Advanced search
Search in files:
dwg
cdw
frw
spw
doc
docx
pdf
Drawings
Standard Documentation
TTK
Earthworks (the 2 page from 3)
Earthworks
24.04.2014
TTK Erection of embankments from imported soil - typical Job Instruction
24.04.2014
TTK Complex-mechanized process of pit arrangement for industrial building in soils of group 3 - typical process flow sheet
24.04.2014
TTK reinforcement of slopes with crushed stone, wood, gravel-pebble or clay soils (typical Job Instruction)
24.04.2014
TTK strengthening of slopes by sowing perennial grasses (typical process flow chart): archive
24.04.2014
TTK Typical Routing for Earthworks - Typical Routing
24.04.2014
TTK arrangement of artificial bases of external networks and low-rise buildings on bulk soils (typical process flow sheet): archive
24.04.2014
TTK Excavation by the pubic face of the excavator eo-3322b equipped with a reverse shovel and loading of soil into the dump - typical process flow sheet
24.04.2014
TTK Development of trenches by excavator etr-134 - typical process flow sheet
24.04.2014
TTK pit arrangement for foundations in wet soils (typical Job Instruction)
24.04.2014
TTK Execution of works on lowering the groundwater level in the pit with the help of a needle filter plant of liu type - typical process flow sheet
24.04.2014
TTK Complex-mechanized process of pit arrangement for industrial building in rock soils - typical process flow sheet
24.04.2014
TTK Reinforcement of slopes with concrete slabs - typical process flow sheet
24.04.2014
TTK Complex-mechanized process of vertical planning of construction site with volume from 50 to 100 thousand m in soils of group 2 - typical process flow sheet
24.04.2014
TTK backfilling of pit sinuses with grapple (typical Job Instruction)
24.04.2014
TTK Excavation works on arrangement of pits for foundations by mechanized method - typical process flow sheet
24.04.2014
TTK Backfill, leveling and compaction of soil in trench with collector - typical Job Instruction
<<
<
1
2
3
>
>>
Up