RU
Waiting For Moderation:
1
en
Русский - RU
Login
Create an account
Menu
AllDrawings
Drawings
Pictures
Subscription
Feedback
Drawings
Drawings content
Pictures
Total:
72542
Advanced search
Search in files:
dwg
cdw
frw
spw
doc
docx
pdf
Drawings
Standard Documentation
TTK
Earthworks (the 2 page from 3)
Earthworks
24.04.2014
TTK Complex-mechanized process of pit arrangement for industrial building in rock soils - typical process flow sheet
24.04.2014
TTK Reinforcement of slopes with concrete slabs - typical process flow sheet
24.04.2014
TTK Complex-mechanized process of vertical planning of construction site with volume from 50 to 100 thousand m in soils of group 2 - typical process flow sheet
24.04.2014
TTK backfilling of pit sinuses with grapple (typical Job Instruction)
24.04.2014
TTK Excavation works on arrangement of pits for foundations by mechanized method - typical process flow sheet
24.04.2014
TTK Backfill, leveling and compaction of soil in trench with collector - typical Job Instruction
24.04.2014
TTK Drilling and immersion of steel pipes for trench and pit anchorages - typical process flow sheet
24.04.2014
TTK Process Sheet for Soil Development in Pit - Typical Process Sheet
24.04.2014
TTK Development of trenches in soils of group 2 by excavator etts-252 - typical process flow sheet
24.04.2014
TTK complex-mechanized process for backfilling of pit with foundations of industrial workshop with soil of groups 2 (typical process flow sheet)
24.04.2014
TTK Excavation by the pubic face of the excavator eo-3322b, equipped with a reverse shovel and loading of the soil of the dump truck - typical process flow sheet
24.04.2014
TTK backfilling, leveling and compaction of soil inside the building for floors (typical Job Instruction)
24.04.2014
TTK device of a tongue-and-groove protection of a ditch (standard checklist): archive
24.04.2014
TTK Development of trenches and pits - typical process flow sheet
24.04.2014
TTK Performance of works during the development of pits by mechanized method for the construction of residential and public buildings - typical process flow sheet
24.04.2014
TTK Erection of embankments from imported soil - typical Job Instruction
<<
<
1
2
3
>
>>
Up