TTK Excavation by the pubic face of the excavator eo-3322b equipped with a reverse shovel and loading of soil into the dump - typical process flow sheet
Description
The archive contains a file with a complete technical map in doc format (Microsoft Word) or in pdf format.
Project's Content
|
|
|
|
The material is an archive with files that can be opened in programs:
- Adobe Acrobat Reader
Similar materials
- 24.04.2014
- 24.04.2014
- 24.04.2014
- 24.04.2014
- 24.04.2014
- 24.04.2014
- 24.04.2014
Free downloading for today
Update after: 21 hours 46 minutes
- 22.11.2024