TTK Erection of prefabricated reinforced concrete slab made of double-void flooring with the device of internal roof frame made of large-sized reinforced concrete columns and runs - typical process flow sheet

- Added: 24.04.2014
- Size: 67 KB
- Downloads: 1
Find out how to download this material
Subscribe to receive an information about new materials:
Description
The archive contains a file with a complete technical map in doc format (Microsoft Word) or in pdf format.
Project's Content
![]() |
![]() |
Similar materials
- 24.04.2014
- 24.04.2014
- 24.04.2014
- 24.04.2014
- 24.04.2014
- 24.04.2014
- 24.04.2014
Free downloading for today
Update after: 14 hours 34 minutes
- 23.08.2014