• RU
  • icon Waiting For Moderation: 6
Menu

TTK Erection of prefabricated reinforced concrete slab made of double-void flooring with the device of internal roof frame made of large-sized reinforced concrete columns and runs - typical process flow sheet

Description

The archive contains a file with a complete technical map in doc format (Microsoft Word) or in pdf format.

Project's Content

icon
icon 514.rtf

Free downloading for today

Update after: 16 hours 56 minutes