• RU
  • icon Waiting For Moderation: 45
Menu

TTK Erection of prefabricated slab of double-void flooring with the device of internal roof frame of large-size reinforced concrete columns and runs - typical Job Instruction

  • Added: 24.04.2014
  • Size: 77 KB
  • Downloads: 0
Find out how to download this material

Description

The archive contains a file with a complete technical map in doc format (Microsoft Word) or in pdf format.

Project's Content

icon
icon 81.doc
up Up