• RU
  • icon Waiting For Moderation: 0
Menu

Course work in the discipline "TECHNOLOGICAL DESIGN OF MOTOR TRANSPORT ENTERPRISES"

  • Added: 08.06.2016
  • Size: 402 KB
  • Downloads: 0
Find out how to download this material

Description

Introduction 3 1 Initial data and their analysis 5 2 Calculation of process parameters of a motor vehicle enterprise 7 2.1 Calculation of production programs for maintenance and repair of cars 7 2.1.1 Correction of vehicle mileage to KR and periodicity TO-1 and TO-2 7 2.1.2 Correction of mileage by average daily mileage (Lcc) of the vehicle 8 2.1.3 Quantity of CG, MT and RO per vehicle per operation cycle before overhaul (NKP, NTO-2, NEO) 8 2.1.4 Determination of coefficient of transition from a cycle by a year 9 2.1.5 Calculation of annual number of KP, TO and EO on all park of cars of one brand 10 2.1.6 Calculation of Number of diagnostic impacts of D-1 and D-2 on all park in a year 11 2.1.7 Definition of the EO, TO-1, TO-2, D-1 and D-2 11 2.2 daily programs Calculation of Annual Amount of Works (labor intensity) for maintenance and maintenance of vehicles and its distribution by types of work 12 2.2.1 Calculation of scope of work of RM, TO and TR for one car 12 2.2.2 Calculation of annual scope of work of TR, TO and TR for the fleet of cars 13 2.2.3 Distribution of annual labor capacity TO-1 and TO-2 by types of works 13 2.2.4 Annual labor capacity of self-service works 14 2.2.5 Distribution of self-service works by types 15 2.2.6 Distribution of post work of TR by types 15 2.2.7 Distribution of labor capacity of TR works by sections 16 2.2.8 Total work volume and 2 capacity. 2.2.9 The total annual labor input of works of EO, TO-1, TO-2, TR and Tsam on the enterprise 20 2.3 Definition of Funds of Time also grows the number of workers of the enterprise 20 3 Calculation of Parameters for Design of Production Zones and Sites of ATP 23 3.1 Organization of Works of structural units of ATP 23 3.1.1 Choice of a method of the organization TO and TP of the cars 23 3.1.2 Operating Mode of Zones TO and TP 24 3.2 Calculation of product lines of continuous action 25 3.2.1 Calculation of indicators for design of zone EO with product lines of continuous action with full mechanization of harvest and washing works and drying of the cars 25 3.3 Calculation of Indicators for design of specialized posts of D-1 and D-2 27 3.4 Calculation of the areas of production sites 28 3.5 Calculation of the areas of warehouse 29 3.6 Calculation of the areas of household rooms 30 3.7 Calculation of the area of the storage area (parking) of cars 30 3.8 the Rated land area of enterprise 30 4. Input data for daily production schedule and return of cars to ATP Bibliographic list 32 Appendix

Project's Content

icon
icon ВАЗ.doc
icon УАЗ.doc
icon готово.docx
up Up