1.1 Objectives and objectives of the project1. Carry out a project to modernize the automation system, and specifically optimize the process of gas incineration.2. Control the boilers using the automation unit depending on the external air temperature. Fill the coolant circuits and make them up in automatic mode.4. Make a schematic diagram of the boiler.5. To develop an operation algorithm of a system of automatic equipment.1.2 Structure the proektagazovy boiler house is in the separate building and is intended for heating and hot water supply of locomotive depot. 2 Logano SK 625-690 and Logano SK 625-530 heating boilers of Buderus with a heating capacity of 690 and 530 kW are installed in the boiler room, respectively. The boilers are equipped with burners WM-G 10/3-A of Weishaupt.CONTENTS 31 Automatic gas boiler room automation device 41.1 Purpose of gas boiler rooms 41.2 Modular gas boiler rooms 51.3 Automatic regulation 61.4 Main equipment and components of automation systems 91.5 Tasks and objectives of the project 161.6 Structure of the modernization project 2.2 Rationale of gas boiler automation systems
Project's Content
|
Пояснительная записка.docx
|
Диплом.dwg
|
Additional information
Contents
CONTENTS
INTRODUCTION
1 Gas Boiler Room Automation Device
1.1 Purpose of gas boilers
1.2 Modular Gas Boiler Rooms
1.3 Automatic regulation
1.4 Main equipment and components of automation systems
1.5 Project Objectives and Objectives
1.6 Structure of the project
2 Gas Boiler Room Automation Project
2.1 Basic Data for Gas Boiler House Design
2.2 Justification of automation systems modernization
2.3 Setting Up Gas Burners
2.4 Functional diagrams of boiler room automation
2.5 As-built documentation for automation systems installation
2.6 Occupational safety
3 Organization of construction production
3.1 Scheduling and work schedule
3.2 Calculation of technical and economic indicators
3.3 Development of the schedule
3.4 Requirements for logistical resources
CONCLUSION
LIST OF SOURCES USED
INTRODUCTION
In Russia, there are strict requirements for the quality of the air environment in closed rooms provided by heating, ventilation and air conditioning systems (OW and KB), for the implementation of measures for occupational health and safety at work, environmental protection, including protection of the atmospheric air, from technological and ventilation emissions. Up to 40% of solid and gaseous fuel and up to 10% of electricity generated in the country are consumed for the operation of the CV and KB systems. I would like to pay special attention to the need to increase the efficiency of heat and gas supply due to the development of new advanced structures, equipping them with automation tools. Significant fuel and electricity savings are possible only with automation of processes in heat and gas supply systems.
However, fuel consumption for heating continues to increase steadily. One way to reduce energy consumption in buildings remains: improving the quality of thermal protection of buildings; improvement of process diagrams and structures of gas supply systems; automation of systems and equipment; recycling of secondary energy resources. More than 50% of the heat requirement is covered by gas fuel. Gas is a good ecological fuel, the use of which, in addition, allows you to fully automate the combustion processes in boilers and effectively operate the entire complex of heating and production heat supply systems. A relatively high degree of automation has been achieved in solid and liquid fuel boiler houses; currently, work is underway on the development of automation systems and automation of gas boiler and gas plants.
Automation and automation systems allow continuous control over gas consumption in all areas of human life, security can only be ensured using automatics systems accurately calculated and correctly installed.
Gas Boiler Room Automation Device
Purpose of gas boilers
Gas boiler houses are the most common type of boiler plants today. The obvious advantages are their low cost of construction and operation compared to other types of boiler plants. The country's extensive gas pipeline network, which is in constant development, allows you to bring gas to almost any point. In addition, gas has a higher heat capacity and heat transfer compared to other types of fuel, it leaves less harmful substances after combustion.
Gas boilers are special devices operating on natural gas or other gases obtained during oil processing and are carried out in both stationary and block-modular configuration.
The main element of any boiler plant is a boiler. Its main elements are screens consisting of bent pipes that serve to transfer heat to a steam-water mixture, steam, water or air, which are also called working bodies. The water that enters the boiler is heated in the furnace to the boiling point, passing through the screens it is smoothly heated to the saturation temperature, converted into steam, which, in turn, is overheated to the necessary temperature.
At the moment, gas boilers and gas plants are equipped with automation systems, so all operating parameters are controlled without the presence of a person.
The main regulatory document is SP 89.13330.2012 "Boiler Plants."
According to the existing rules, gas control units should be installed inside the boiler building, while gas control points should be located on the site.
Type of water treatment plants is selected based on
SP 31.13330.2012 "Water supply. External networks and structures. Updated version of SNiP 2.04.0284. "
Project Objectives and Objectives
Carry out a project to modernize the automation system, and specifically optimize the gas combustion process.
Control the boilers using the automation unit depending on the external air temperature.
Fill the coolant circuits and make them up automatically.
Make a schematic diagram of the boiler room.
Develop an algorithm for the operation of the automation system.
Project Composition
The gas boiler house is located in a separate building and is designed for heating and hot water supply to the locomotive depot. In the boiler room there are 2 water heating boilers Logano SK 625690 and Logano SK 625530 of Buderus with a heating capacity of 690 and 530 kW, respectively. The boilers are equipped with WMG 10/3-A burners from Weishaupt.
CONCLUSION
As a result of the completed diploma project, the automation of the boiler room was modernized. The complex of equipment is designed, installed and configured to control the oxygen content in the flue gases, to control the speed of rotation of the fan. As a result, energy costs are reduced by 10%... 50% fuel consumption is reduced by 3%... 10% at the same boiler capacity. Drew up a local estimate, developed a schedule of work at the site.