Construction of quarterly modular boiler houses - Thermal network of the modular boiler house of MGK in Kizel on the street. Physical culture
- Added: 03.07.2014
- Size: 5 MB
- Downloads: 0
Find out how to download this material
Subscribe to receive an information about new materials:
Description
Heat networks with all chambers from blocks, with pipes laid in the ground, with route plans, detailed specification, the project passed state verification. The project includes new Isoproflex pipes flexible and immediately with insulation, docking methods, etc.
Project's Content
|
Сборный.dwg
|
тепловые камеры.dwg
|
СА.dwg
|
Additional information
Drawings content
Сборный.dwg
СА.dwg
Similar materials
- 26.09.2022
- 11.05.2019
- 29.07.2014
- 09.07.2014
Free downloading for today
Update after: 4 hours 4 minutes
- 20.08.2014