Course project 'Development of tractor crane with side canopy'. Course design for lifting vehicles Initial data: 1Load lifting mg = 3000 kg, 2Boom lift 3 m, 3High lift height h = 5 m, 4High lift speed V = 6 m/min, 5HE operating mode = 25% (medium), 6Polyspast: single. Detailed calculation of side crane installation for caterpillar tractor is given

Project's Content

icon
icon Общий вид трактора.cdw
icon ПТМ.docx
icon Спецификация сборка.spw
icon траверса.cdw
icon чертеж блока.cdw
icon Чертеж ось.cdw
icon Чертеж сборка крюк.cdw

Additional information

Contents

Source Data

Introduction

Selection of rope

Calculation of hook cage parts

Hook and Bearing Selection

Traverse Calculation

Block Calculation

Calculation of bar

Selection of radial bearings

Drum calculation

Calculation of rope attachment

Selection of hydraulic motor

Check of crane stability

List of literary sources

Applications

Introduction

Caterpillar cranes among rail-free cranes have the highest cross-country ability and maneuverability (with the exception of short-gas cranes). Low specific pressure on the ground (from 0.06 to 0.2 MPa), a significant supporting circuit provides the ability to move the machine along the soil platforms. The disadvantage of their large specific resistance to movement and low speeds.

Cranes installed on tractors are divided into two main types, these are: boom cranes and cranes pipe laying

Boom cranes on tractors are a group of small-capacity vehicles. As a base of cranes, serial tracked tractors are usually used. For short distances or from object to object, cranes move in their own way (up to 15 km/h), when transporting over long distances, trailers or railway platforms are used.

The pipe-laying crane consists of a basic machine and a caterpillar tractor, mounted lifting and transportation equipment, a control system and is designed to hold the pipeline during its cleaning and insulation, laying pipelines in trenches, etc.

Unlike other boom cranes, the pipe laying is equipped with an A-shaped side boom, the load moment on which is balanced usually by a hinged counter load. Boom of pipe laying has two movements - lifting and lowering. The pipe-laying device can move with full load corresponding to this flight.

Tractor cranes-pipe laying operate in a mode different from the mode of operation of conventional lifting cranes. So, the main condition of their work is the lifting by several pipe layouts of a simultaneously welded pipe stack. The load on each pipe-laying device depends not only on the line weight and the distance between the pipe-laying devices, but also on the height by which the load is raised, since the load distribution between the individual machines changes.

Drawings content

icon Общий вид трактора.cdw

Общий вид трактора.cdw

icon Спецификация сборка.spw

Спецификация сборка.spw

icon траверса.cdw

траверса.cdw

icon чертеж блока.cdw

чертеж блока.cdw

icon Чертеж ось.cdw

Чертеж ось.cdw

icon Чертеж сборка крюк.cdw

Чертеж сборка крюк.cdw
up Up