• RU
  • icon Waiting For Moderation: 0
Menu

The construction of a road repair point km 107, at the entrance to the village. Gornopravdinsk.

  • Added: 29.07.2014
  • Size: 18 MB
  • Downloads: 0
Find out how to download this material

Description

Road Repair Building Construction Project

Project's Content

icon
icon
icon Состав проекта 107 км.doc
icon
icon ОПЗ 107.doc
icon
icon Ведомость объёмов работБлагоустройство.doc
icon ГП подъезд.dwg
icon площадка отдыха.doc
icon Сводная ведомость съезд1.doc
icon
icon Записка.doc
icon План кабельных линий.dwg
icon ТЗП.dwg
icon фрагмент плана тзп1.dwg
icon
icon ООС в рамке.doc
icon
icon календарный план.bak
icon календарный план.dwg
icon ПОС 107.doc
icon стройгенплан.dwg
icon
icon
icon nov gp.dwg
icon
icon HBK.dwg
icon К нвк.dwg
icon НВК.dwg
icon
icon 20-09-ЭС.doc
icon ДРП-107км__НО.dwg
icon ДРП-107км__ЭС.dwg
icon Спецификация ДРП_107_НО.С.doc
icon Телефонизация.doc
icon телефонизация.dwg
icon
icon
icon Раздел АР1.dwg
icon
icon KP.dwg
icon
icon ТХ ДРП выпуск.dwg
icon
icon ОВ ДРП выпуск.dwg
icon ОВ_ДРП_107_км_Корректировки_2_2004.dwg
icon
icon ВК ДРП.dwg
icon
icon ДРП-107км__ЭОМ.bak
icon ДРП-107км__ЭОМ.dwg
icon ДРП_107-ЭОМ.С(АБК).doc
icon
icon ОПС ДРП выпуск.dwg
icon
icon
icon Акр.bak
icon Акр.dwg
icon
icon ДРП_107_АР.ЭО.dwg
icon Спецификация ДРП_107_АР.ЭО.doc
icon
icon
icon hf.dwg
icon Открытая площадка для приготовления ПСС.dwg
icon ПЗ.doc
icon
icon Установка для приготовления пескосоляной смеси.bak
icon Установка для приготовления пескосоляной смеси.dwg

Additional information

Source data.

The working project "Construction of the highway" in Khanty-Mansiysk - Gornopravdinsk - the highway in Tyumen - Khanty-Mansiysk "Construction of a road repair point at 107 km at the entrance to the village. Gonopravdinsk" was carried out by the project team of the State Enterprise "Severavtodor" on the basis of a technical assignment.

Ii. technical and economic part.

Climatic characteristics

The geographical location of the territory under consideration determines its climatic characteristics.

The territory under consideration is marked by a harsh long winter with strong winds, blizzards, stable snow cover and rather hot, but short summers. Transitional seasons are short, with sharp fluctuations in temperature. Spring and early summer are arid. To characterize the climate of the region, the data of the nearest weather station in Khanty-Mansiysk were used and given according to SNiP 2.0182 and ST.51.00.00582 "Guidelines for determining the characteristics of the construction climatology of oil and gas producing regions of Western Siberia."

Main design solutions.

Structural instructions for the PSS site.

The construction structures in this project are: steel horizontal reservoir CSG - 18 underground installation.

The mixture is prepared by means of a sand-salt mixture preparation unit.

The reservoir for collecting rain and melt effluents is designed from steel pipes with a diameter of 1420x10 mm. End faces of tanks are made with strips of steel sheet with thickness of 14 mm.

The neck with height of 600 mm is equipped with a rainwater grate and a badge for retention of soil particles contained in waste water.

The neck with a height of 900 mm is equipped with a removable cover and serves to collect effluents from the tank. The top of the horizontal tanks is 600 mm lower than the planning elevations of the rainfall grids (deepening 600 mm).

Steel pipe material - steel 20 as per GOST 873174, sheet and shaped iron - steel C255 as per GOST 2777288.

To cook all seams electrodes of the GOST 946775 E42 A type.

Corrosion protection of steel tanks shall be performed in accordance with SNiP 2.03.1185 and GOST 9.01574.

To protect the outer surfaces from underground corrosion, use a bitumen mineral coating consisting of a bitumen primer with a thickness of 50... 100 mm and a bitumen mineral mastic with a thickness of 3... 4 mm: the mastic should be applied no later than 10... 12 days after applying the primer, since the primer coating through 10... 12 days becomes fragile and loses its properties.

Bitumen primers are made of bitumen dissolved in gasoline at a ratio of 1:3 by volume, or 1:2 by weight.

Bitumen-mineral mastics are made of bitumen (70% by weight), mineral filler (dolomite, asphalt limestone or dolominized limestone of average density - 25% by weight) and green oil according to GOST 61072 (5% by weight).

To protect the internal surfaces, use EP773 epoxy enamel (GOST 2314378) as per EP0010 (GOST 1027776). Coating thickness - 0.1... 0.15 mm.

Coating on metal surfaces shall be preceded by a surface preparation process consisting in the removal of peeling rolled scale, rust, fat and other contaminants.

Drawings content

icon ГП подъезд.dwg

ГП подъезд.dwg

icon План кабельных линий.dwg

План кабельных линий.dwg

icon ТЗП.dwg

ТЗП.dwg

icon фрагмент плана тзп1.dwg

фрагмент плана тзп1.dwg

icon календарный план.dwg

календарный план.dwg

icon стройгенплан.dwg

стройгенплан.dwg

icon nov gp.dwg

nov gp.dwg

icon HBK.dwg

HBK.dwg

icon К нвк.dwg

К нвк.dwg

icon НВК.dwg

НВК.dwg

icon ДРП-107км__НО.dwg

ДРП-107км__НО.dwg

icon телефонизация.dwg

телефонизация.dwg

icon Раздел АР1.dwg

Раздел АР1.dwg

icon KP.dwg

KP.dwg

icon ТХ ДРП выпуск.dwg

ТХ ДРП выпуск.dwg

icon ОВ ДРП выпуск.dwg

ОВ ДРП выпуск.dwg

icon ОВ_ДРП_107_км_Корректировки_2_2004.dwg

ОВ_ДРП_107_км_Корректировки_2_2004.dwg

icon ВК ДРП.dwg

ВК ДРП.dwg

icon ДРП-107км__ЭОМ.dwg

ДРП-107км__ЭОМ.dwg

icon ОПС ДРП выпуск.dwg

ОПС ДРП выпуск.dwg

icon Акр.dwg

Акр.dwg

icon ДРП_107_АР.ЭО.dwg

ДРП_107_АР.ЭО.dwg

icon hf.dwg

hf.dwg

icon Открытая площадка для приготовления ПСС.dwg

Открытая площадка для приготовления ПСС.dwg

icon Установка для приготовления пескосоляной смеси.dwg

Установка для приготовления пескосоляной смеси.dwg
up Up