• RU
  • icon Waiting For Moderation: 16
Menu

Technology and organization of construction production

  • Added: 09.03.2014
  • Size: 850 KB
  • Downloads: 0
Find out how to download this material

Description

Part of the diploma project, 2 drawings .
Gripping, installation diagram. horizontal section, vertical section, section along external angle of 90 °, lower abutment to window opening, vertical abutment to window opening, work schedule.

Project's Content

icon
icon техкарты.dwg

Additional information

Drawings content

icon техкарты.dwg

техкарты.dwg
up Up