• RU
  • icon Waiting For Moderation: 1
Menu

Technical re-equipment of the boiler house with the installation of 2 boilers

Description

Technical re-equipment of the boiler room with the installation of 2 boilers. The project provides

 

- dismantling - existing E-1.0-0.9 boilers, sections of low-pressure gas pipes from these boilers, chimneys of these boilers;

 

- installation - installation of new boilers TT 50-400 and TT 100-1500, sections of low pressure gas pipes and chimneys from new boilers.

Project's Content

icon 4 ГСВ Вятские поляны 09.12.22 (1).dwg
icon 2 ПЗ ГСВ.docx
The material is an archive with files that can be opened in programs:
  • AutoCAD or DWG TrueView
  • Microsoft Word
up Up