Shopping center heating
- Added: 12.02.2019
- Size: 2 MB
- Downloads: 0
Description
The project "Heating System of the Shopping Center" "was developed on the basis of the following documents: - contract No. ___ for the development of working documentation; This section of the detailed documentation is developed in accordance with the following requirements of the documents: - GOST R 21.1101-2013 "Basic requirements for design and detailed documentation"; - GOST 21.602-2003 "SPDS. Rules for performance of working documentation of heating, ventilation and air conditioning "; - SNiP 41-01-2003 " Heating, ventilation and air conditioning "; - SP 60.13330.2012" Heating, ventilation and air conditioning. Updated revision of SNiP 41-01-2003 "; - SP 118.13330.2012 (updated revision of SNiP 31-06-2009) " Public Buildings and Structures "; - SP 73.13330.2012 (updated revision of SNiP 3.05.01-85)" Internal sanitary and technical systems of buildings "; - SP 131.13330.2012." Updated edition of SNiP 23-01-99 "; - GOST 30494-2011" Residential and public buildings. Indoor microclimate parameters "; - SP 50.13330.2012" Thermal protection of buildings. Updated revision of SNiP 23-02-2003 "; - GOST 21.605-82" SPDS. Thermal networks (thermal and mechanical part) (with Change N 1) "; - SNiP 41-02-2003 " Thermal networks "; - SP 124.13330.2012" Thermal networks. Updated revision of SNiP 41-02-2003 "; - SNiP 3.05.03-85" Thermal networks "; - SP 61.13330.2012" Thermal insulation of equipment and pipelines. Updated version of SNiP 41-03-2003 . " The working documentation corresponds to the design assignment, requirements of the current technical regulations, standards, codes of rules, other documents containing the established requirements. All deviations from detailed design documentation shall be agreed with the design organization and the Customer prior to commencement of works.
Project's Content
|
ТС.doc
|
ТС.dwg
|
Similar materials
- 09.07.2014
- 09.07.2014
- 22.06.2015