• RU
  • icon Waiting For Moderation: 10
Menu

Routing for earthworks with calculations

  • Added: 03.08.2012
  • Size: 280 KB
  • Downloads: 1
Find out how to download this material

Description

Process Calculations

Project's Content

icon
icon ведомость трудозатрат.xlsx
icon Пояснительная записка.docx
icon Технологическая карта.dwg

Additional information

Contents

General description of works

Excavation during the construction of the underground part of the building can be divided into the following simple construction processes:

- cutting of vegetable layer;

- excavation soil development;

- loading of soil into vehicles or behind the edge of the trench

- soil transportation;

- unloading of soil into dump;

- cleaning of trenches bottom;

- backfilling;

Adverse hydrogeological, climatic and special conditions may require additional processes (drainage or artificial lowering of ground water level, loosening of dense soils, fixing of excavation walls, etc.)

The main process by which the selection of the driving machine and the linking of the remaining mechanization tools is carried out is the development of soil in the excavation

The initial data for the design of earthworks are:

soil type and humidity - II gr., oily clay without impurities, average density in natural occurrence is 1900 kg/m

trench depth H = 2.0 m;

width of trenches 4 m,

length: 4 trenches of 217 m

2 trenches of 55 m

Slope slope (its ratio in height to laying) for clays - 1:

General description of works.

Excavation during the construction of the underground part of the building can be divided into the following simple construction processes :

- cutting of vegetable layer;

- excavation soil development;

- loading of soil into vehicles or behind the edge of the trench

- soil transportation;

- unloading of soil into dump;

- cleaning of trenches bottom;

- backfill;.

Unfavorable hydrogeological, climatic and special conditions may require additional processes (drainage or artificial lowering of ground water level, loosening of dense soils, fixing of excavation walls, etc.).

The main process by which the selection of the driving machine and the linkage of the other means of mechanization is carried out is the development of soil in the excavation.

The initial data for the design of earthworks are:

soil type and humidity - II gr., oily clay without impurities, average density in natural occurrence is 1900 kg/m3

trench depth H = 2.0 m;

width of trenches 4 m,

length: 4 trenches of 217 m

2 trenches of 55 m each.

Slope slope (its ratio in height to laying) for clays is 1:2.

Drawings content

icon Технологическая карта.dwg

Технологическая карта.dwg

Free downloading for today

Update after: 1 hour 14 minutes
up Up