Exchange rate project on the organization of construction production
- Added: 12.06.2018
- Size: 1 MB
- Downloads: 0
Find out how to download this material
Subscribe to receive an information about new materials:
Description
Course project on the theme: Organization of reconstruction of the existing building, including the extension of the elevator shaft of the passenger elevator
Project's Content
chertezh1-22.dwg
|
Similar materials
- 27.01.2015
- 01.07.2014
Free downloading for today
Update after: 6 hours 32 minutes