• RU
  • icon Waiting For Moderation: 0
Menu

Exchange rate project on the organization of construction production

  • Added: 12.06.2018
  • Size: 1 MB
  • Downloads: 0
Find out how to download this material

Description

Course project on the theme: Organization of reconstruction of the existing building, including the extension of the elevator shaft of the passenger elevator

Project's Content

icon chertezh1-22.dwg

Free downloading for today

Update after: 6 hours 32 minutes
up Up