• RU
  • icon Waiting For Moderation: 8
Menu

Exchange rate project for the organization of construction production

  • Added: 11.05.2014
  • Size: 2 MB
  • Downloads: 1
Find out how to download this material

Description

As part of the project: explanatory note with all calculations, drawings A-1 and A-2 (Object Budgplan). Fully prepared course project. In Ukrainian.

Project's Content

icon
icon ОСП Лист.dwg
icon Продолжительность.xls
icon склады.xls
icon зааписка.DOC
icon Вибір кранів.doc
icon ОСП Лист.bak
icon МОЯ архитектура2.dwg

Additional information

Drawings content

icon МОЯ архитектура2.dwg

МОЯ архитектура2.dwg
up Up