Organization of Avtogarazh construction plant
- Added: 01.07.2014
- Size: 135 KB
- Downloads: 0
Description
Project's Content
|
Мижитов.dwg
|
Мижитов.doc
|
Additional information
Contents
Introduction
1. Main provisions for the organization and planning of the construction of the facility
2. Site characteristics and construction conditions
2.1 General part
2.2 Characteristics of the object
2.3 Structural characteristics of the building
2.4 Characteristics of the construction area
3. Determination of standard duration of construction of the facility and individual works
4. Calculation of physical volumes
5. Selection of earth-moving machines
6. Calculation of vehicle requirements
7. Selection of cranes for structural installation
8. Selection of mounting mechanisms according to the required parameters of lifting capacity, boom departure, crane hook lifting height
9 Comparison of variants
10. Calculation of normative labour intensity and machine capacity of construction of the main object with the composition of the workers' links
11. Network Work and Resource Master Data
12. Preparation of estimates
12.1 Local cost estimate for construction of the facility
13. Development of a summary schedule for the construction of the facility
14. Organization and technology of building erection
15. Technical and economic indicators of the PPR
16. Calculation of temporary buildings and structures
17. Calculation of electricity demand for the period of construction, power supply
18. Description of the general plan structure
19. Occupational safety in construction
20. Safety precautions for the construction period
21. Environmental protection activities
List of literature used
Introduction.
This course project is designed to consolidate the knowledge of students in the discipline of "organization of construction production" by practical application of the issues set forth in it. It provides for the development of the main elements of the construction organization project (PIC) for housing and civil facilities in the housing estate in accordance with SNIP 3.01.01.85:
Construction Master Plan
Summary list of construction and installation works complexes
Schedule of work personnel requirements
Calculation of requirements for logistics, water, electricity, temporary buildings and construction maintenance with justification
The organization of construction production is one of the main functions of management in construction. The formation of knowledge on the organization of production is based on the study of construction technology, the construction industry, transport, as well as on the study of the basics of production process management.
Main provisions on the organization and
Site Construction Planning
The organization and planning of the work at the construction site is based on the in-line method, the main principles of which are the continuity and rhythm of the production, as well as the scheduling of the individual types of work. When combined with a high degree of building assembly, this method is most effective. The simultaneous execution of work by teams on different grips allows you to perform the required amount of work on one gripper and prepare the next operation, thereby drastically reducing the duration of work. With this metole, work is carried out by complex or special teams with a permanent composition, which means high quality of work.
In addition, the efficiency of the flow method is expressed in the uniform and most complete use of the labor resources of production throughout the construction period. The sequence of construction is determined by the requirements of the work process. The relationship and sequence of construction and installation works with accepted technological and organizational methods is reflected in organizational models, one of which is network. It allows you to choose the best option for the work, use all reserves.
Characteristics of the facility and construction conditions.
2.1 General part.
The topic of the task: to develop a construction organization project for the construction of an auto garage building.
The construction period is 8 months, the start of construction is April, sands, a source of water and power supply from the city network and transformer substation, respectively, according to local conditions, conditions for supplying construction with parts and materials from construction industry plants.
Additional guidance on starting materials: installation of main components from vehicles.
Construction area: Ulan-Ude.
Engineering training includes external water supply networks, sewerage, power supply, construction of roads, and driveways, improvement of the territory.
The construction area is free of buildings and has a calm relief. Seismicity-8 points.
Site soils with design resistance of 2 kgf/cm2.
The supply of construction water, heat, electricity and communications is provided from existing networks.
2.2 Characteristics of the object.
The car garage complex includes: 1) a production building, a transformer room, a canopy, a cylinder warehouse, a equipment warehouse, an open work site, and machine washing.
Auto garage is intended for machine maintenance. The building of the truck garage is equipped with the following sanitary and technical systems: water supply and drinking water supply from external water supply networks (head at the inlet H = 17.57 m) sewage domestic - fecal to the city network, heating - central, water (coolant parameters 9570 С, ventilation - with mechanical inducement and natural, power supply - from village networks with a voltage of 380220 V, radioactivation and communication device
2.4 Characteristics of the construction area
The construction site is the rural area of UlanUde, the estimated temperature is 37, the amount of precipitation per year is -287 mm, the maximum daily allowance is -92 mm. In winter, the predominance of westerly winds, in the summer of northwestern winds, Ulan-Ude is located in the climatic subunit 1B., the weight of the snow cover is -150 kgsm2.
Geological conditions are normal, seismicity -8 points.
3. Determination of standard duration of construction of the facility.
The standard duration of construction we determine on Construction Norms and Regulations 1.04.03.85., chastII "Norma durations of construction and a reserve in construction of the enterprises, buildings, Section 3.5. For the car garage complex, the construction duration is 11.6 months.
When calculating the duration of work for a given object in the work calculation list. The estimated construction duration was found, which amounted to 147 days.