• RU
  • icon Waiting For Moderation: 2
Menu

Modernization of main heating networks of the district heating system - boiler house

  • Added: 09.10.2022
  • Size: 17 MB
  • Downloads: 0
Find out how to download this material

Description

The project includes drawings:

1  "Boiler plants";

2  "Design of autonomous heat supply sources;

3  "Design of heat points";  

4  "Heat networks";

5  "Thermal insulation of equipment and pipelines"

 

Coolant parameters:  

coolant - water;

design capacity - 1.73 MW;  

                                            temperature graph - 95-70 ° C;

coolant consumption - 59.3 t/h (winter); - 0,00 t/h (summer period);

                                           actual pressure - Rp = 4.5 kgf/ cm², Po = 1.1 kgf / cm².

The design temperature of the outside air is minus 30.0 ° C.

The fuel for the boiler house is diesel fuel (main + backup) with Qn = 10800 kcal / m³.

According to the reliability of heat supply to consumers, the boiler house belongs to the II category.

According to the terms of reference, it is planned to install 3 boilers with a nominal capacity of 1000 kW (2 working 1 backup)

Project's Content

icon 7.ТМ Устьевое.dwg

Additional information

Drawings content

icon 7.ТМ Устьевое.dwg

7.ТМ Устьевое.dwg
up Up