• RU
  • icon Waiting For Moderation: 1
Menu

Development of a detailed project for the modernization of the sewerage network of the industrial site

Description

Working drawings are designed for the following natural and climatic conditions:

- outdoor temperature of the coldest five-day period 

Project's Content

icon 208-2022 плита под пескоуловитель Мухамеджан 25.04.23.dwg
The material is a file that can be opened in program:
  • AutoCAD or DWG TrueView
up Up