• RU
  • icon Waiting For Moderation: 22
Menu

Development of a detailed project for the modernization of the sewerage network of the industrial site

  • Added: 28.04.2023
  • Size: 4 MB
  • Downloads: 0
Find out how to download this material

Description

Working drawings are designed for the following natural and climatic conditions:

- outdoor temperature of the coldest five-day period 

Project's Content

icon 208-2022 плита под пескоуловитель Мухамеджан 25.04.23.dwg
up Up