Development of a detailed project for the modernization of the sewerage network of the industrial site
- Added: 28.04.2023
- Size: 4 MB
- Downloads: 0
Find out how to download this material
Subscribe to receive an information about new materials:
Description
Working drawings are designed for the following natural and climatic conditions:
- outdoor temperature of the coldest five-day period
Project's Content
208-2022 плита под пескоуловитель Мухамеджан 25.04.23.dwg
|
Similar materials
- 25.01.2023
- 09.07.2014
- 22.02.2015
- 25.01.2023
- 15.01.2015
- 04.11.2022
Free downloading for today
Update after: 6 hours 18 minutes