Design of ARP for 5000 of repairs of cargo vehicles per year, labour intensity of one repair - 185 hours
- Added: 09.07.2014
- Size: 306 KB
- Downloads: 0
Description
Project's Content
|
|
компоновка1.cdw
|
Пояснительная записка.docx
|
содержание.doc
|
Титульный лист.docx
|
Чертёж сварочно-наплавочного участка.cdw
|
Additional information
Contents
Introduction
Regulatory references and abbreviations
1. Determination of ATS annual scope of work
2. Justification of the structure of the repair enterprise
3. Mechanical Shop Design
4. Assembly Shop Design
5. Painting area
6. Determine the number of workers and areas of production sites
7. Define Warehouse Areas
8. Test Shop Design
9. Transport system design
10. Energy part
11. Welding and surfacing area design
12. Layout of ATM housing
Conclusion
List of literature used
Introduction
During the operation of the car, its working properties gradually
deteriorating due to wear of parts, as well as corrosion and fatigue
the material from which they are made. Failures appear in the car and
faults that are eliminated during maintenance and
repair.
A car that meets all the requirements is considered serviceable
regulatory and technical documentation.
A serviceable car, unlike a serviceable one, must
meet only those requirements that enable
use it for its intended purpose without a threat to traffic safety.
A serviceable car can be faulty, for example, have
deteriorated appearance, reduced pressure in the lubrication system
engine.
Damage is called the transition of the car to the faulty, but serviceable
a capable state; it is called the transition to an inoperable state
refusal.
Repair is a set of recovery operations
correctness or operability of products and restoration of product resources
and their components.
The need and expediency of repairing vehicles are due to
first of all, inequality of their components (assembly units and structures
parts). It is known that to create an equal-strength car, all the details of which
wear would be uniform and have the same service life, impossible -
but. Therefore, in the course of operation, cars pass by road
in new enterprises (ATP) periodic maintenance and, if necessary, current re-
mount (TP), which is carried out by replacing individual parts and units
This allows you to maintain cars in a technically serviceable condition -
nii.
With long-term operation, cars reach such a state,
when their repair under ATP conditions becomes technically impossible or
economically impractical. In this case, they are sent to the central
scheduled maintenance or overhaul (CR) for the automotive repair enterprise
measurement (ATM).
Conclusion
As a result of the project work, the structure of the ATM was developed. The annual ATM program has been defined (Hpr = 5000). The annual volume of main production is determined. The main workshops of the enterprise were developed, their area, the number of working personnel, etc.
The originality and peculiarity of the designed ARP is that on the basis of this enterprise it is possible to carry out a complete overhaul of all various brands and modifications.
The project adopts a straight-flow layout scheme, its advantages are straightforward and, accordingly, convenient movement of basic and other large and heavy parts, minimal crossing of traffic flows.
Production sites are assigned fire and explosive hazard categories. This company complies with all the standards and requirements of the production building.
The number of process equipment units in the welding and surfacing area was calculated and a layout plan was developed.
The calculation results are as follows:
- annual scope of ARS Tg = 925000, hourly hours;
- number of production and auxiliary workers ∑Ri=519 people;
- total area of production and auxiliary
uchastkov∑Fvg= 6897, m2;
- total storage area ∑Fck= 290, m2;
- design area of the production building of ARP ∑Fpac= 6985m2.
In addition, the following are calculated: transport system and energy
ARA requirements.
Experience gained in ATM and manufacturing design
plots will be used in the diploma project.