• RU
  • icon Waiting For Moderation: 0
Menu

Construction of a shift camp for a gold recovery plant

Description

The rotational camp consists of 9 modular buildings, containment type.

1. Meal pick-up point for 60 seats. The item is a dining room with a distribution and pre-preparation kitchen.  

2. Living quarters for 4 persons.

3. Laundry  

4. Toilet  

5. Shower room

6. Infirmary

7. Checkpoint

Bath

Project's Content

icon Вахтовый поселок ТХ.dwg
The material is a file that can be opened in program:
  • AutoCAD or DWG TrueView

Free downloading for today

Update after: 13 hours 37 minutes
up Up