Construction of a shift camp for 160 places, installation of an asphalt concrete plant and a crusher
- Added: 30.08.2023
- Size: 8 MB
- Downloads: 3
Subscribe to receive an information about new materials:
Description
Construction of a shift camp for 160 places, installation of an asphalt concrete plant and a crusher
Project's Content
|
|
The material is a file that can be opened in program:
- AutoCAD or DWG TrueView
Similar materials
- 09.07.2014
- 21.03.2022
- 13.04.2022
- 24.04.2014
- 07.11.2025
Free downloading for today
Update after: 6 hours 32 minutes